
Dormer Loft Conversions in Cirencester
A dormer loft conversion is one of the most cost-effective ways to add a bedroom to a house in Cirencester without losing garden. Here is what it costs locally, what the rules are and how we work.
Dormer prices in Cirencester
Guide prices for Cirencester, adjusted for labour and material costs in the South West. Rear dormers typically cost £35,995 to £56,745 here.
| Service | Guide price | Time on site |
|---|---|---|
| Hip-to-Gable and Rear Dormer Conversions | £53,495 to £77,245 | 8 to 11 weeks |
| Front Dormer Loft Conversions | £32,995 to £56,745 | 7 to 10 weeks |
| Dormer Loft Conversions with En-Suite | £46,245 to £71,995 | 7 to 10 weeks |
| L-Shaped Dormer Loft Conversions | £46,245 to £69,995 | 8 to 10 weeks |
| Dormer Shell Conversions | £18,495 to £32,995 | 3 to 5 weeks |
| Dormer Design, Plans and Approvals | £1,745 to £4,745 | 3 to 6 weeks for drawings |
| Terraced House Dormer Loft Conversions | £36,995 to £57,745 | 6 to 9 weeks |
| Juliet Balcony Dormers | £1,495 to £3,495 | Added within the main build |
About Cirencester
Cirencester has a population of about 20,000. Bungalows are a big part of the housing stock here, so dormers that turn a single storey into a two-storey home are a frequent request.
Planning in Cirencester
Whatever the planning position in Cirencester, building regulations approval is always required. It covers structure, fire safety, stairs, insulation and electrics, and ends with a completion certificate you will need when you sell.
How it works
- Free surveyA surveyor visits, measures the roof and tells you plainly what will and will not work.
- Fixed quoteA written, itemised price with the drawings it is based on.
- PaperworkBuilding regulations, lawful development or planning, and party wall notices.
- ConstructionMost of the work is done from the scaffold; we break through for the stairs near the end.
Questions people ask
How long does a dormer loft conversion take?
On site, 6 to 8 weeks for a rear dormer. Design and approvals usually add four to eight weeks before the start date.
Do I need building regulations approval?
Yes, always. Building control checks the structure, fire safety, stairs, insulation and electrics, and issues a completion certificate at the end.
What will the dormer be clad in?
Usually hanging tiles or slates to match the roof, which the permitted development rules favour. Zinc, fibre-cement and render are options where planning permission is being sought anyway.
Who do I contract with?
Your contract is with S&K Property Investments and Improvement Ltd. The work is carried out by our vetted subcontract teams under our supervision, and we remain responsible for it.
Do you deal with party wall notices?
Yes. If your home is terraced or semi-detached we prepare the notices under the Party Wall etc. Act 1996. Your neighbour may appoint a surveyor, whose reasonable fees you would pay.