Dormer Loft Conversions
Zinc-clad dormer corner meeting a slate roof

Dormer Cladding and Roofing

Dormer cladding and roofing covers the outer skin of a dormer: the cheeks and face, the flat or pitched roof, and the flashings where it meets the main roof.

£2,495 to £8,995Guide price for this element in 2026. Time on site: 3 to 10 days.

Older dormers often have felt roofs at the end of their life, rotten timber cheeks or little insulation. Re-covering one is a short job that stops leaks and cuts heat loss.

We re-clad in hanging tile, slate, zinc, fibre-cement or uPVC, and re-roof in GRP or EPDM, adding insulation where the build-up allows.

What is included?

  • Old felt stripped and the deck inspected and repaired
  • GRP or EPDM flat roof with new edge trims
  • Cheeks re-clad in tile, slate, zinc or fibre-cement
  • New lead or proprietary flashings and soakers
  • Insulation upgraded while the dormer is open
  • Fascias, soffits and gutter renewed
Zinc-clad dormer corner meeting a slate roof

Does it need planning permission?

Like-for-like repairs to an existing dormer do not normally need planning permission; a change of material on a visible dormer in a conservation area may. Building regulations approval is always required. See our planning guide and building regulations guide.

How it works

  1. Free surveyA surveyor visits, measures the roof and tells you plainly what will and will not work.
  2. Fixed quoteA written, itemised price with the drawings it is based on.
  3. PaperworkBuilding regulations, lawful development or planning, and party wall notices.
  4. ConstructionMost of the work is done from the scaffold; we break through for the stairs near the end.

Questions about dormer cladding and roofings

How long does a dormer flat roof last?

A well-laid GRP or EPDM roof commonly lasts 25 years or more, compared with 10 to 15 for traditional felt.

Can you insulate an old dormer from outside?

Often, yes. With the cladding off we can add insulation between and over the studs, and a warm-roof build-up on the flat roof if the height allows.

Do I need building regulations approval?

Yes, always. Building control checks the structure, fire safety, stairs, insulation and electrics, and issues a completion certificate at the end.

Can we stay in the house during the work?

Yes. Most of the build is done from the scaffold through the roof. The disruptive part is fitting the new stairs, which usually takes a few days near the end.

Who do I contract with?

Your contract is with S&K Property Investments and Improvement Ltd. The work is carried out by our vetted subcontract teams under our supervision, and we remain responsible for it.

Dormer Cladding and Roofing by area

Free survey, fixed written quote

Find out what your loft can take

Tell us your postcode and house type. A surveyor will call to arrange a visit, measure the roof and confirm the planning route, then you get one fixed price in writing.

Reviews

We only publish reviews from real customers, so there are none here yet. Had work done by us? Tell us how it went.

Call freeGet a guide price