Dormer Loft Conversions
Elevation and section drawings for a dormer loft conversion on a desk

Dormer Design, Plans and Approvals

Our dormer design and planning service produces the measured survey, drawings and structural calculations a dormer loft conversion needs, and manages the approvals.

£1,745 to £4,495Guide price for this element in 2026. Time on site: 3 to 6 weeks for drawings.

Every dormer needs building regulations approval, and some need planning permission. Even where permitted development applies, a lawful development certificate is worth having when you sell.

You can use the drawings with us or take them to another builder. If we go on to build the conversion, the design work carries through with no handover.

What is included?

  • Measured survey of the house and roof
  • Existing and proposed plans, elevations and sections
  • Structural engineer's calculations for beams and floor
  • Permitted development check with volume calculation
  • Lawful development certificate or planning application
  • Building regulations drawings and submission
Elevation and section drawings for a dormer loft conversion on a desk

Does it need planning permission?

A lawful development certificate is optional but confirms in writing that your dormer did not need planning permission. Building regulations approval is always required. See our planning guide and building regulations guide.

How it works

  1. SurveyWe measure the loft, check head height and structure, and confirm what planning route applies.
  2. Design and quoteYou receive drawings, a specification and one fixed written price.
  3. ApprovalsWe deal with building control, party wall notices and any planning paperwork.
  4. BuildScaffold up, steel in, dormer built and made watertight, then stairs and interior.

Questions about dormer design and planning services

Do I need an architect for a dormer?

You need drawings and structural calculations that satisfy building control; they do not have to come from an architect. Our designers and engineer produce both.

How long does approval take?

Allow about eight weeks for a lawful development certificate or householder planning decision once validated. Building regulations plans approval usually takes less.

Do I need building regulations approval?

Yes, always. Building control checks the structure, fire safety, stairs, insulation and electrics, and issues a completion certificate at the end.

Can we stay in the house during the work?

Yes. Most of the build is done from the scaffold through the roof. The disruptive part is fitting the new stairs, which usually takes a few days near the end.

Who do I contract with?

Your contract is with S&K Property Investments and Improvement Ltd. The work is carried out by our vetted subcontract teams under our supervision, and we remain responsible for it.

Dormer Design, Plans and Approvals by area

Free survey, fixed written quote

Find out what your loft can take

Tell us your postcode and house type. A surveyor will call to arrange a visit, measure the roof and confirm the planning route, then you get one fixed price in writing.

Reviews

We only publish reviews from real customers, so there are none here yet. Had work done by us? Tell us how it went.

Call freeGet a guide price