
Dormer Loft Conversions in Eltham
If your Eltham home needs another bedroom or a place to work, the loft is usually the cheapest space to gain. This page covers a dormer loft conversion in Eltham: price, planning and timescale.
Dormer prices in Eltham
Guide prices for Eltham, adjusted for labour and material costs in London. Rear dormers typically cost £43,745 to £68,745 here.
| Service | Guide price | Time on site |
|---|---|---|
| Side Dormer Loft Conversions | £43,745 to £62,495 | 6 to 9 weeks |
| Dormer Loft Conversions with En-Suite | £56,245 to £87,495 | 7 to 10 weeks |
| Dormer Shell Conversions | £22,495 to £39,995 | 3 to 5 weeks |
| Terraced House Dormer Loft Conversions | £44,995 to £69,995 | 6 to 9 weeks |
| Rear Dormer Loft Conversions | £43,745 to £68,745 | 6 to 8 weeks |
| Dormer Cladding and Roofing | £2,995 to £11,245 | 3 to 10 days |
| Bungalow Dormer Loft Conversions | £56,245 to £99,995 | 8 to 12 weeks |
| Full-Width Dormer Loft Conversions | £52,495 to £77,495 | 7 to 9 weeks |
About Eltham
We cover the whole of Eltham, about 4 miles from Bexley. Inter-war semis with hipped roofs line much of outer London; they usually suit a rear dormer, often paired with a hip-to-gable.
Planning in Eltham
Before designing anything for a Eltham property we check three things: whether permitted development rights are intact, whether the house is in a conservation area, and how much roof volume has already been used.
How it works
- Free surveyA surveyor visits, measures the roof and tells you plainly what will and will not work.
- Fixed quoteA written, itemised price with the drawings it is based on.
- PaperworkBuilding regulations, lawful development or planning, and party wall notices.
- ConstructionMost of the work is done from the scaffold; we break through for the stairs near the end.
Questions people ask
What will the dormer be clad in?
Usually hanging tiles or slates to match the roof, which the permitted development rules favour. Zinc, fibre-cement and render are options where planning permission is being sought anyway.
Do I need planning permission in Eltham?
Usually not for a rear dormer on a house. It is normally permitted development within the volume limits. Flats, conservation areas, listed buildings and front dormers facing a road do need permission.
How long does a dormer loft conversion take?
On site, 6 to 8 weeks for a rear dormer. Design and approvals usually add four to eight weeks before the start date.
Who do I contract with?
Your contract is with S&K Property Investments and Improvement Ltd. The work is carried out by our vetted subcontract teams under our supervision, and we remain responsible for it.
How are payments staged?
In stages tied to progress, set out in your quote: a deposit, then payments as the structure, weathertight shell and interior are completed. We do not ask for the full price up front.