Dormer Loft Conversions
Full-width box dormer across the rear roof of a semi-detached house

Dormer Loft Conversions in Stratford

Our Greater London team carries out dormer loft conversions in Stratford from first survey to building control completion certificate, with the same site lead throughout.

Dormer prices in Stratford

Guide prices for Stratford, adjusted for labour and material costs in London. Rear dormers typically cost £43,745 to £68,745 here.

ServiceGuide priceTime on site
Dormer Design, Plans and Approvals£2,245 to £5,4953 to 6 weeks for drawings
Pitched Roof Dormer Loft Conversions£37,495 to £72,4956 to 10 weeks
Dormer Shell Conversions£22,495 to £39,9953 to 5 weeks
Full-Width Dormer Loft Conversions£52,495 to £77,4957 to 9 weeks
Dormer Loft Conversions with En-Suite£56,245 to £87,4957 to 10 weeks
Terraced House Dormer Loft Conversions£44,995 to £69,9956 to 9 weeks
Hip-to-Gable and Rear Dormer Conversions£64,995 to £93,7458 to 11 weeks
Bungalow Dormer Loft Conversions£56,245 to £99,9958 to 12 weeks

About Stratford

We cover the whole of Stratford, about 2 miles from Canary Wharf. Victorian and Edwardian terraces with two-storey rear outriggers are the classic candidates here, which is why L-shaped dormers are so common on London streets.

Planning in Stratford

Stratford is covered by England's permitted development rules. A dormer on a house usually needs no planning application if it stays within the volume limit, does not face the highway and uses materials similar in appearance to the existing roof.

How it works

  1. Look at the loftHead height, roof type, stairs position and any previous roof additions are checked on site.
  2. Agree the designLayout, windows, cladding and specification, with a fixed price to match.
  3. Get approvalsWe submit to building control and serve notices so the start date is realistic.
  4. Build and sign offStructure, dormer, roof, stairs, rooms, then the completion certificate.

Questions people ask

Do you cover the area around Stratford?

Yes. We work throughout Greater London, including West Ham, Bow, Canning Town.

How long does a dormer loft conversion take?

On site, 6 to 8 weeks for a rear dormer. Design and approvals usually add four to eight weeks before the start date.

Can we stay in the house during the work?

Yes. Most of the build is done from the scaffold through the roof. The disruptive part is fitting the new stairs, which usually takes a few days near the end.

Do I need building regulations approval?

Yes, always. Building control checks the structure, fire safety, stairs, insulation and electrics, and issues a completion certificate at the end.

Do I need planning permission in Stratford?

Usually not for a rear dormer on a house. It is normally permitted development within the volume limits. Flats, conservation areas, listed buildings and front dormers facing a road do need permission.

Nearby towns

Call freeGet a guide price