Dormer Loft Conversions
Full-width box dormer across the rear roof of a semi-detached house

Dormer Loft Conversions in Heywood

A dormer loft conversion is one of the most cost-effective ways to add a bedroom to a house in Heywood without losing garden. Here is what it costs locally, what the rules are and how we work.

Dormer prices in Heywood

Guide prices for Heywood, adjusted for labour and material costs in the North West. Rear dormers typically cost £33,245 to £52,245 here.

ServiceGuide priceTime on site
L-Shaped Dormer Loft Conversions£42,745 to £64,4958 to 10 weeks
Dormer Shell Conversions£16,995 to £30,4953 to 5 weeks
Dormer Cladding and Roofing£2,495 to £8,4953 to 10 days
Rear Dormer Loft Conversions£33,245 to £52,2456 to 8 weeks
Front Dormer Loft Conversions£30,495 to £52,2457 to 10 weeks
Side Dormer Loft Conversions£33,245 to £47,4956 to 9 weeks
Dormer Design, Plans and Approvals£1,745 to £4,2453 to 6 weeks for drawings
Hip-to-Gable and Rear Dormer Conversions£49,495 to £71,2458 to 11 weeks

About Heywood

Heywood has a population of about 28,000. Rows of brick terraces with slate roofs are typical across the North West, and a slate-clad rear dormer sits comfortably on them.

Planning in Heywood

Heywood is covered by England's permitted development rules. A dormer on a house usually needs no planning application if it stays within the volume limit, does not face the highway and uses materials similar in appearance to the existing roof.

How it works

  1. SurveyWe measure the loft, check head height and structure, and confirm what planning route applies.
  2. Design and quoteYou receive drawings, a specification and one fixed written price.
  3. ApprovalsWe deal with building control, party wall notices and any planning paperwork.
  4. BuildScaffold up, steel in, dormer built and made watertight, then stairs and interior.

Questions people ask

What will the dormer be clad in?

Usually hanging tiles or slates to match the roof, which the permitted development rules favour. Zinc, fibre-cement and render are options where planning permission is being sought anyway.

How long does a dormer loft conversion take?

On site, 6 to 8 weeks for a rear dormer. Design and approvals usually add four to eight weeks before the start date.

Who do I contract with?

Your contract is with S&K Property Investments and Improvement Ltd. The work is carried out by our vetted subcontract teams under our supervision, and we remain responsible for it.

Do you cover the area around Heywood?

Yes. We work throughout Greater Manchester, including Middleton, Rochdale, Bury.

Do I need planning permission in Heywood?

Usually not for a rear dormer on a house. It is normally permitted development within the volume limits. Flats, conservation areas, listed buildings and front dormers facing a road do need permission.

Nearby towns

Call freeGet a guide price