Dormer Loft Conversions
Rear dormer loft conversion with tile-hung cheeks on a brick semi-detached house

Dormer Loft Conversions in Sale

A dormer loft conversion is one of the most cost-effective ways to add a bedroom to a house in Sale without losing garden. Here is what it costs locally, what the rules are and how we work.

Dormer prices in Sale

Guide prices for Sale, adjusted for labour and material costs in the North West. Rear dormers typically cost £33,245 to £52,245 here.

ServiceGuide priceTime on site
L-Shaped Dormer Loft Conversions£42,745 to £64,4958 to 10 weeks
Rear Dormer Loft Conversions£33,245 to £52,2456 to 8 weeks
Dormer Design, Plans and Approvals£1,745 to £4,2453 to 6 weeks for drawings
Juliet Balcony Dormers£1,495 to £3,245Added within the main build
Dormer Shell Conversions£16,995 to £30,4953 to 5 weeks
Terraced House Dormer Loft Conversions£34,245 to £53,2456 to 9 weeks
Dormer Loft Conversions with En-Suite£42,745 to £66,4957 to 10 weeks
Front Dormer Loft Conversions£30,495 to £52,2457 to 10 weeks

About Sale

We cover the whole of Sale, about 5 miles from Salford. Rows of brick terraces with slate roofs are typical across the North West, and a slate-clad rear dormer sits comfortably on them.

Planning in Sale

Whatever the planning position in Sale, building regulations approval is always required. It covers structure, fire safety, stairs, insulation and electrics, and ends with a completion certificate you will need when you sell.

How it works

  1. SurveyWe measure the loft, check head height and structure, and confirm what planning route applies.
  2. Design and quoteYou receive drawings, a specification and one fixed written price.
  3. ApprovalsWe deal with building control, party wall notices and any planning paperwork.
  4. BuildScaffold up, steel in, dormer built and made watertight, then stairs and interior.

Questions people ask

What about bats?

Bats and their roosts are protected by law. If there are signs of bats in the loft, a licensed ecologist must survey before work starts; we will tell you if we see any at survey.

Can we stay in the house during the work?

Yes. Most of the build is done from the scaffold through the roof. The disruptive part is fitting the new stairs, which usually takes a few days near the end.

How long does a dormer loft conversion take?

On site, 6 to 8 weeks for a rear dormer. Design and approvals usually add four to eight weeks before the start date.

Is the survey free?

Yes. The survey and written quote are free and you are under no obligation to go ahead.

Will a dormer add value to my Sale home?

An extra bedroom generally adds value, but how much depends on the street and the local market. A local estate agent can tell you what four-bedroom homes sell for near you.