Dormer Loft Conversions
Slate-clad flat-roofed rear dormer on a brick terraced house

Dormer Loft Conversions in St Albans

We build dormer loft conversions for homeowners in St Albans and across Hertfordshire. Dormers are all we do, so the design, the structure and the paperwork are routine for our teams.

Dormer prices in St Albans

Guide prices for St Albans, adjusted for labour and material costs in the East of England. Rear dormers typically cost £36,745 to £57,745 here.

ServiceGuide priceTime on site
Front Dormer Loft Conversions£33,495 to £57,7457 to 10 weeks
Dormer Cladding and Roofing£2,495 to £9,4953 to 10 days
Pitched Roof Dormer Loft Conversions£31,495 to £60,9956 to 10 weeks
Juliet Balcony Dormers£1,495 to £3,745Added within the main build
Terraced House Dormer Loft Conversions£37,745 to £58,7456 to 9 weeks
L-Shaped Dormer Loft Conversions£47,245 to £71,4958 to 10 weeks
Full-Width Dormer Loft Conversions£43,995 to £64,9957 to 9 weeks
Dormer Design, Plans and Approvals£1,995 to £4,7453 to 6 weeks for drawings

About St Albans

Chalet bungalows and inter-war semis are common in this part of the country, and both are regular dormer projects. St Albans itself is home to roughly 85,000 people, about 7 miles from Watford.

Planning in St Albans

Planning rules in St Albans are the national ones for England: 40 cubic metres of added roof volume for a terrace, 50 for a semi or detached house, nothing forward of the roof slope facing the road, and no balconies.

How it works

  1. Look at the loftHead height, roof type, stairs position and any previous roof additions are checked on site.
  2. Agree the designLayout, windows, cladding and specification, with a fixed price to match.
  3. Get approvalsWe submit to building control and serve notices so the start date is realistic.
  4. Build and sign offStructure, dormer, roof, stairs, rooms, then the completion certificate.

Questions people ask

How are payments staged?

In stages tied to progress, set out in your quote: a deposit, then payments as the structure, weathertight shell and interior are completed. We do not ask for the full price up front.

Is my loft high enough?

As a rule of thumb you need about 2.2 metres from the top of the ceiling joists to the underside of the ridge. A dormer then gives full height across most of the room.

How long does a dormer loft conversion take?

On site, 6 to 8 weeks for a rear dormer. Design and approvals usually add four to eight weeks before the start date.

Is the survey free?

Yes. The survey and written quote are free and you are under no obligation to go ahead.

What about bats?

Bats and their roosts are protected by law. If there are signs of bats in the loft, a licensed ecologist must survey before work starts; we will tell you if we see any at survey.

Nearby towns

Call freeGet a guide price