Dormer Loft Conversions in Boston
We build dormer loft conversions for homeowners in Boston and across Lincolnshire. Dormers are all we do, so the design, the structure and the paperwork are routine for our teams.
Dormer prices in Boston
Guide prices for Boston, adjusted for labour and material costs in the East Midlands. Rear dormers typically cost £33,495 to £52,745 here.
| Service | Guide price | Time on site |
|---|---|---|
| Front Dormer Loft Conversions | £30,745 to £52,745 | 7 to 10 weeks |
| Juliet Balcony Dormers | £1,495 to £3,245 | Added within the main build |
| Terraced House Dormer Loft Conversions | £34,495 to £53,745 | 6 to 9 weeks |
| Dormer Cladding and Roofing | £2,495 to £8,745 | 3 to 10 days |
| Full-Width Dormer Loft Conversions | £40,245 to £59,495 | 7 to 9 weeks |
| Dormer Design, Plans and Approvals | £1,745 to £4,245 | 3 to 6 weeks for drawings |
| Bungalow Dormer Loft Conversions | £43,245 to £76,745 | 8 to 12 weeks |
| Semi-Detached Dormer Loft Conversions | £36,495 to £57,495 | 6 to 10 weeks |
About Boston
We cover the whole of Boston, about 27 miles from Lincoln. Much of the housing here is two-storey brick terraces and semis with simple gable roofs, which are among the easiest roofs to add a dormer to.
Planning in Boston
Boston is covered by England's permitted development rules. A dormer on a house usually needs no planning application if it stays within the volume limit, does not face the highway and uses materials similar in appearance to the existing roof.
How it works
- SurveyWe measure the loft, check head height and structure, and confirm what planning route applies.
- Design and quoteYou receive drawings, a specification and one fixed written price.
- ApprovalsWe deal with building control, party wall notices and any planning paperwork.
- BuildScaffold up, steel in, dormer built and made watertight, then stairs and interior.
Questions people ask
What will the dormer be clad in?
Usually hanging tiles or slates to match the roof, which the permitted development rules favour. Zinc, fibre-cement and render are options where planning permission is being sought anyway.
Do I need planning permission in Boston?
Usually not for a rear dormer on a house. It is normally permitted development within the volume limits. Flats, conservation areas, listed buildings and front dormers facing a road do need permission.
How long does a dormer loft conversion take?
On site, 6 to 8 weeks for a rear dormer. Design and approvals usually add four to eight weeks before the start date.
Can we stay in the house during the work?
Yes. Most of the build is done from the scaffold through the roof. The disruptive part is fitting the new stairs, which usually takes a few days near the end.
Will a dormer add value to my Boston home?
An extra bedroom generally adds value, but how much depends on the street and the local market. A local estate agent can tell you what four-bedroom homes sell for near you.