Dormer Loft Conversions in Caerphilly

A dormer loft conversion is one of the most cost-effective ways to add a bedroom to a house in Caerphilly without losing garden. Here is what it costs locally, what the rules are and how we work.

Dormer prices in Caerphilly

Guide prices for Caerphilly, adjusted for labour and material costs in Wales. Rear dormers typically cost £32,245 to £50,495 here.

ServiceGuide priceTime on site
Semi-Detached Dormer Loft Conversions£34,995 to £55,2456 to 10 weeks
Dormer Cladding and Roofing£2,245 to £8,2453 to 10 days
Pitched Roof Dormer Loft Conversions£27,495 to £53,2456 to 10 weeks
Dormer Loft Conversions with En-Suite£41,495 to £64,4957 to 10 weeks
Full-Width Dormer Loft Conversions£38,745 to £56,9957 to 9 weeks
Hip-to-Gable and Rear Dormer Conversions£47,745 to £68,9958 to 11 weeks
Rear Dormer Loft Conversions£32,245 to £50,4956 to 8 weeks
Front Dormer Loft Conversions£29,495 to £50,4957 to 10 weeks

About Caerphilly

We cover the whole of Caerphilly, about 7 miles from Cardiff. Valley terraces, coastal bungalows and inter-war semis all appear here; Wales has its own permitted development rules, so we check early.

Planning in Caerphilly

In Caerphilly, as everywhere in Wales, building regulations approval is required for a loft conversion whatever the planning position. Wales has its own Approved Documents, and we design to those.

How it works

  1. Free surveyA surveyor visits, measures the roof and tells you plainly what will and will not work.
  2. Fixed quoteA written, itemised price with the drawings it is based on.
  3. PaperworkBuilding regulations, lawful development or planning, and party wall notices.
  4. ConstructionMost of the work is done from the scaffold; we break through for the stairs near the end.

Questions people ask

Is the survey free?

Yes. The survey and written quote are free and you are under no obligation to go ahead.

What will the dormer be clad in?

Usually hanging tiles or slates to match the roof, which the permitted development rules favour. Zinc, fibre-cement and render are options where planning permission is being sought anyway.

How long does a dormer loft conversion take?

On site, 6 to 8 weeks for a rear dormer. Design and approvals usually add four to eight weeks before the start date.

How are payments staged?

In stages tied to progress, set out in your quote: a deposit, then payments as the structure, weathertight shell and interior are completed. We do not ask for the full price up front.

What about bats?

Bats and their roosts are protected by law. If there are signs of bats in the loft, a licensed ecologist must survey before work starts; we will tell you if we see any at survey.