
Dormer Loft Conversions in Egham
Our Surrey team carries out dormer loft conversions in Egham from first survey to building control completion certificate, with the same site lead throughout.
Dormer prices in Egham
Guide prices for Egham, adjusted for labour and material costs in the South East. Rear dormers typically cost £39,245 to £61,495 here.
| Service | Guide price | Time on site |
|---|---|---|
| Juliet Balcony Dormers | £1,745 to £3,995 | Added within the main build |
| L-Shaped Dormer Loft Conversions | £50,495 to £76,245 | 8 to 10 weeks |
| Semi-Detached Dormer Loft Conversions | £42,495 to £67,245 | 6 to 10 weeks |
| Dormer Cladding and Roofing | £2,745 to £9,995 | 3 to 10 days |
| Hip-to-Gable and Rear Dormer Conversions | £58,245 to £83,995 | 8 to 11 weeks |
| Side Dormer Loft Conversions | £39,245 to £55,995 | 6 to 9 weeks |
| Pitched Roof Dormer Loft Conversions | £33,495 to £64,995 | 6 to 10 weeks |
| Full-Width Dormer Loft Conversions | £46,995 to £69,495 | 7 to 9 weeks |
About Egham
We cover the whole of Egham, about 2 miles from Staines. Many commuter-belt streets are 1930s to 1960s houses with generous roof pitches, which tend to give good head height for a dormer.
Planning in Egham
Whatever the planning position in Egham, building regulations approval is always required. It covers structure, fire safety, stairs, insulation and electrics, and ends with a completion certificate you will need when you sell.
How it works
- Free surveyA surveyor visits, measures the roof and tells you plainly what will and will not work.
- Fixed quoteA written, itemised price with the drawings it is based on.
- PaperworkBuilding regulations, lawful development or planning, and party wall notices.
- ConstructionMost of the work is done from the scaffold; we break through for the stairs near the end.
Questions people ask
Do you cover the area around Egham?
Yes. We work throughout Surrey, including Staines, Chertsey, Ashford.
Do I need building regulations approval?
Yes, always. Building control checks the structure, fire safety, stairs, insulation and electrics, and issues a completion certificate at the end.
Is my loft high enough?
As a rule of thumb you need about 2.2 metres from the top of the ceiling joists to the underside of the ridge. A dormer then gives full height across most of the room.
How long does a dormer loft conversion take?
On site, 6 to 8 weeks for a rear dormer. Design and approvals usually add four to eight weeks before the start date.
Do I need planning permission in Egham?
Usually not for a rear dormer on a house. It is normally permitted development within the volume limits. Flats, conservation areas, listed buildings and front dormers facing a road do need permission.