Dormer Loft Conversions in Felling

Homeowners in Felling ask us the same three things about a dormer loft conversion: what it costs, whether it needs planning permission and how long it takes. The answers are below.

Dormer prices in Felling

Guide prices for Felling, adjusted for labour and material costs in the North East. Rear dormers typically cost £31,495 to £49,495 here.

ServiceGuide priceTime on site
Dormer Loft Conversions with En-Suite£40,495 to £62,9957 to 10 weeks
Full-Width Dormer Loft Conversions£37,745 to £55,7457 to 9 weeks
Pitched Roof Dormer Loft Conversions£26,995 to £52,2456 to 10 weeks
Hip-to-Gable and Rear Dormer Conversions£46,745 to £67,4958 to 11 weeks
Front Dormer Loft Conversions£28,745 to £49,4957 to 10 weeks
Bungalow Dormer Loft Conversions£40,495 to £71,9958 to 12 weeks
Rear Dormer Loft Conversions£31,495 to £49,4956 to 8 weeks
Side Dormer Loft Conversions£31,495 to £44,9956 to 9 weeks

About Felling

With around 34,000 residents, Felling gives us a steady flow of enquiries. Terraces, Tyneside flats and post-war semis make up much of the North East's housing; houses, not flats, benefit from permitted development rights.

Planning in Felling

Planning rules in Felling are the national ones for England: 40 cubic metres of added roof volume for a terrace, 50 for a semi or detached house, nothing forward of the roof slope facing the road, and no balconies.

How it works

  1. Look at the loftHead height, roof type, stairs position and any previous roof additions are checked on site.
  2. Agree the designLayout, windows, cladding and specification, with a fixed price to match.
  3. Get approvalsWe submit to building control and serve notices so the start date is realistic.
  4. Build and sign offStructure, dormer, roof, stairs, rooms, then the completion certificate.

Questions people ask

Do you deal with party wall notices?

Yes. If your home is terraced or semi-detached we prepare the notices under the Party Wall etc. Act 1996. Your neighbour may appoint a surveyor, whose reasonable fees you would pay.

How long does a dormer loft conversion take?

On site, 6 to 8 weeks for a rear dormer. Design and approvals usually add four to eight weeks before the start date.

What will the dormer be clad in?

Usually hanging tiles or slates to match the roof, which the permitted development rules favour. Zinc, fibre-cement and render are options where planning permission is being sought anyway.

How are payments staged?

In stages tied to progress, set out in your quote: a deposit, then payments as the structure, weathertight shell and interior are completed. We do not ask for the full price up front.

Do you cover the area around Felling?

Yes. We work throughout Tyne and Wear, including Gateshead, Newcastle upon Tyne, Hebburn.