Dormer Loft Conversions
Tile-hung rear dormer on one of a pair of semi-detached houses

Dormer Loft Conversions in West Midlands

We build dormer loft conversions for homeowners in West Midlands and across West Midlands. Dormers are all we do, so the design, the structure and the paperwork are routine for our teams.

Dormer prices in West Midlands

Guide prices for West Midlands, adjusted for labour and material costs in the West Midlands. Rear dormers typically cost £33,995 to £53,245 here.

ServiceGuide priceTime on site
Rear Dormer Loft Conversions£33,995 to £53,2456 to 8 weeks
L-Shaped Dormer Loft Conversions£43,745 to £65,9958 to 10 weeks
Side Dormer Loft Conversions£33,995 to £48,4956 to 9 weeks
Front Dormer Loft Conversions£30,995 to £53,2457 to 10 weeks
Full-Width Dormer Loft Conversions£40,745 to £60,2457 to 9 weeks
Pitched Roof Dormer Loft Conversions£28,995 to £56,2456 to 10 weeks
Hip-to-Gable and Rear Dormer Conversions£50,495 to £72,7458 to 11 weeks
Bungalow Dormer Loft Conversions£43,745 to £77,4958 to 12 weeks
Terraced House Dormer Loft Conversions£34,995 to £54,2456 to 9 weeks
Semi-Detached Dormer Loft Conversions£36,745 to £58,2456 to 10 weeks
Dormer Loft Conversions with En-Suite£43,745 to £67,9957 to 10 weeks
Dormer Design, Plans and Approvals£1,745 to £4,2453 to 6 weeks for drawings
Dormer Shell Conversions£17,495 to £30,9953 to 5 weeks
Dormer Cladding and Roofing£2,495 to £8,7453 to 10 days
Juliet Balcony Dormers£1,495 to £3,495Added within the main build

About West Midlands

Our West Midlands team covers 24 towns and cities. Inter-war semis with hipped roofs are everywhere in this region; a rear dormer, sometimes with a hip-to-gable, is the usual answer.

Planning in West Midlands

West Midlands is covered by England's permitted development rules. A dormer on a house usually needs no planning application if it stays within the volume limit, does not face the highway and uses materials similar in appearance to the existing roof.

How it works

  1. SurveyWe measure the loft, check head height and structure, and confirm what planning route applies.
  2. Design and quoteYou receive drawings, a specification and one fixed written price.
  3. ApprovalsWe deal with building control, party wall notices and any planning paperwork.
  4. BuildScaffold up, steel in, dormer built and made watertight, then stairs and interior.

Questions people ask

How long does a dormer loft conversion take?

On site, 6 to 8 weeks for a rear dormer. Design and approvals usually add four to eight weeks before the start date.

Do I need planning permission in West Midlands?

Usually not for a rear dormer on a house. It is normally permitted development within the volume limits. Flats, conservation areas, listed buildings and front dormers facing a road do need permission.

How are payments staged?

In stages tied to progress, set out in your quote: a deposit, then payments as the structure, weathertight shell and interior are completed. We do not ask for the full price up front.

Do I need building regulations approval?

Yes, always. Building control checks the structure, fire safety, stairs, insulation and electrics, and issues a completion certificate at the end.

What about bats?

Bats and their roosts are protected by law. If there are signs of bats in the loft, a licensed ecologist must survey before work starts; we will tell you if we see any at survey.

Places covered by our West Midlands team

Call freeGet a guide price