Dormer Loft Conversions
Tile-hung rear dormer on one of a pair of semi-detached houses

Dormer Loft Conversions in Shoreham-by-Sea

If your Shoreham-by-Sea home needs another bedroom or a place to work, the loft is usually the cheapest space to gain. This page covers a dormer loft conversion in Shoreham-by-Sea: price, planning and timescale.

Dormer prices in Shoreham-by-Sea

Guide prices for Shoreham-by-Sea, adjusted for labour and material costs in the South East. Rear dormers typically cost £39,245 to £61,495 here.

ServiceGuide priceTime on site
Dormer Design, Plans and Approvals£1,995 to £4,9953 to 6 weeks for drawings
Dormer Shell Conversions£20,245 to £35,7453 to 5 weeks
Side Dormer Loft Conversions£39,245 to £55,9956 to 9 weeks
Pitched Roof Dormer Loft Conversions£33,495 to £64,9956 to 10 weeks
Hip-to-Gable and Rear Dormer Conversions£58,245 to £83,9958 to 11 weeks
Terraced House Dormer Loft Conversions£40,245 to £62,7456 to 9 weeks
Front Dormer Loft Conversions£35,745 to £61,4957 to 10 weeks
Bungalow Dormer Loft Conversions£50,495 to £89,4958 to 12 weeks

About Shoreham-by-Sea

1930s semis and chalet bungalows are widespread across the South East, and both take a rear dormer well. Shoreham-by-Sea itself is home to roughly 19,200 people, about 5 miles from Worthing.

Planning in Shoreham-by-Sea

Shoreham-by-Sea is covered by England's permitted development rules. A dormer on a house usually needs no planning application if it stays within the volume limit, does not face the highway and uses materials similar in appearance to the existing roof.

How it works

  1. Free surveyA surveyor visits, measures the roof and tells you plainly what will and will not work.
  2. Fixed quoteA written, itemised price with the drawings it is based on.
  3. PaperworkBuilding regulations, lawful development or planning, and party wall notices.
  4. ConstructionMost of the work is done from the scaffold; we break through for the stairs near the end.

Questions people ask

What will the dormer be clad in?

Usually hanging tiles or slates to match the roof, which the permitted development rules favour. Zinc, fibre-cement and render are options where planning permission is being sought anyway.

Who do I contract with?

Your contract is with S&K Property Investments and Improvement Ltd. The work is carried out by our vetted subcontract teams under our supervision, and we remain responsible for it.

Do you deal with party wall notices?

Yes. If your home is terraced or semi-detached we prepare the notices under the Party Wall etc. Act 1996. Your neighbour may appoint a surveyor, whose reasonable fees you would pay.

Do you cover the area around Shoreham-by-Sea?

Yes. We work throughout West Sussex, including Lancing, Worthing, Burgess Hill.

Do I need building regulations approval?

Yes, always. Building control checks the structure, fire safety, stairs, insulation and electrics, and issues a completion certificate at the end.

Nearby towns

Call freeGet a guide price