Dormer Loft Conversions
Timber-framed dormer under construction with scaffolding

Dormer Shell Conversions in Radcliffe

Homeowners in Radcliffe ask us the same three things about a dormer shell conversion: what it costs, whether it needs planning permission and how long it takes. The answers are below.

What does a dormer shell conversion cost in Radcliffe?

£16,995 to £30,495Guide price for a typical project in Radcliffe, 2026.

Expect to pay around £16,995 to £30,495 in Radcliffe. Steelwork, stairs and the dormer structure are the larger costs; decoration and flooring are the smaller ones.

Will it need planning permission in Radcliffe?

Planning rules in Radcliffe are the national ones for England: 40 cubic metres of added roof volume for a terrace, 50 for a semi or detached house, nothing forward of the roof slope facing the road, and no balconies.

Planning and permitted development rules are the same for a shell as for a full conversion; building control signs off the finished project.

Dormer conversions in Radcliffe

Radcliffe has a population of about 30,000. Terraced streets and 1930s semis make up most of the homes we are asked about in this region.

What is included?

A dormer shell conversion completes the structural work, the dormer, the roof coverings and the windows, leaving the interior for you or your own trades to finish.

  • Windows and roof windows fitted
  • Written scope of what is and is not included
  • Dormer built, insulated externally and made weathertight
  • Steel beams and new floor joists installed

How it works

  1. Free surveyA surveyor visits, measures the roof and tells you plainly what will and will not work.
  2. Fixed quoteA written, itemised price with the drawings it is based on.
  3. PaperworkBuilding regulations, lawful development or planning, and party wall notices.
  4. ConstructionMost of the work is done from the scaffold; we break through for the stairs near the end.

Questions about a dormer shell conversion in Radcliffe

Do you cover the area around Radcliffe?

Yes. We work throughout Greater Manchester, including Whitefield, Prestwich, Bury.

How long does a dormer shell conversion take?

On site, 3 to 5 weeks. Design and approvals usually add four to eight weeks before the start date.

What about bats?

Bats and their roosts are protected by law. If there are signs of bats in the loft, a licensed ecologist must survey before work starts; we will tell you if we see any at survey.

Is the survey free?

Yes. The survey and written quote are free and you are under no obligation to go ahead.

What is not included in a shell conversion?

Usually first and second fix electrics and plumbing, internal insulation and plasterboard, plastering, joinery and decoration. The written scope lists each item.

Nearby

Read more: Dormer Shell Conversions · cost guide · planning rules

Call freeGet a guide price