Our Hampshire team carries out dormer shell conversions in Yateley from first survey to building control completion certificate, with the same site lead throughout.

What does a dormer shell conversion cost in Yateley?

£20,245 to £35,745Guide price for a typical project in Yateley, 2026.

Budget £20,245 to £35,745 for a dormer shell conversion in Yateley. Your written quote will be a fixed price based on a survey of your roof, not a per-square-metre guess.

Dormer conversions in Yateley

With around 20,000 residents, Yateley gives us a steady flow of enquiries. Many commuter-belt streets are 1930s to 1960s houses with generous roof pitches, which tend to give good head height for a dormer.

Will it need planning permission in Yateley?

Whatever the planning position in Yateley, building regulations approval is always required. It covers structure, fire safety, stairs, insulation and electrics, and ends with a completion certificate you will need when you sell.

Planning and permitted development rules are the same for a shell as for a full conversion; building control signs off the finished project.

What is included?

A dormer shell conversion completes the structural work, the dormer, the roof coverings and the windows, leaving the interior for you or your own trades to finish.

  • Written scope of what is and is not included
  • Roof coverings, cladding and flashings finished
  • Windows and roof windows fitted
  • Stair opening formed; staircase optional

How it works

  1. Look at the loftHead height, roof type, stairs position and any previous roof additions are checked on site.
  2. Agree the designLayout, windows, cladding and specification, with a fixed price to match.
  3. Get approvalsWe submit to building control and serve notices so the start date is realistic.
  4. Build and sign offStructure, dormer, roof, stairs, rooms, then the completion certificate.

Questions about a dormer shell conversion in Yateley

How are payments staged?

In stages tied to progress, set out in your quote: a deposit, then payments as the structure, weathertight shell and interior are completed. We do not ask for the full price up front.

How long does a dormer shell conversion take?

On site, 3 to 5 weeks. Design and approvals usually add four to eight weeks before the start date.

Do I need planning permission in Yateley?

Usually not for a rear dormer on a house. It is normally permitted development within the volume limits. Flats, conservation areas, listed buildings and front dormers facing a road do need permission.

Can we stay in the house during the work?

Yes. Most of the build is done from the scaffold through the roof. The disruptive part is fitting the new stairs, which usually takes a few days near the end.

Who gets the completion certificate?

Building control issues one certificate for the finished conversion, so the interior work must also be inspected. We tell you which stages to book.