Dormer Loft Conversions
Timber-framed dormer under construction with scaffolding

Dormer Shell Conversions in Sandown

We build dormer shell conversions for homeowners in Sandown and across Isle of Wight. Dormers are all we do, so the design, the structure and the paperwork are routine for our teams.

What does a dormer shell conversion cost in Sandown?

£20,245 to £35,745Guide price for a typical project in Sandown, 2026.

Budget £20,245 to £35,745 for a dormer shell conversion in Sandown. Your written quote will be a fixed price based on a survey of your roof, not a per-square-metre guess.

Will it need planning permission in Sandown?

Before designing anything for a Sandown property we check three things: whether permitted development rights are intact, whether the house is in a conservation area, and how much roof volume has already been used.

Planning and permitted development rules are the same for a shell as for a full conversion; building control signs off the finished project.

Dormer conversions in Sandown

Sandown has a population of about 20,000. Many commuter-belt streets are 1930s to 1960s houses with generous roof pitches, which tend to give good head height for a dormer.

What is included?

A dormer shell conversion completes the structural work, the dormer, the roof coverings and the windows, leaving the interior for you or your own trades to finish.

  • Dormer built, insulated externally and made weathertight
  • Written scope of what is and is not included
  • Steel beams and new floor joists installed
  • Windows and roof windows fitted

How it works

  1. SurveyWe measure the loft, check head height and structure, and confirm what planning route applies.
  2. Design and quoteYou receive drawings, a specification and one fixed written price.
  3. ApprovalsWe deal with building control, party wall notices and any planning paperwork.
  4. BuildScaffold up, steel in, dormer built and made watertight, then stairs and interior.

Questions about a dormer shell conversion in Sandown

Do I need planning permission in Sandown?

Usually not for a rear dormer on a house. It is normally permitted development within the volume limits. Flats, conservation areas, listed buildings and front dormers facing a road do need permission.

How long does a dormer shell conversion take?

On site, 3 to 5 weeks. Design and approvals usually add four to eight weeks before the start date.

Who do I contract with?

Your contract is with S&K Property Investments and Improvement Ltd. The work is carried out by our vetted subcontract teams under our supervision, and we remain responsible for it.

What will the dormer be clad in?

Usually hanging tiles or slates to match the roof, which the permitted development rules favour. Zinc, fibre-cement and render are options where planning permission is being sought anyway.

Who gets the completion certificate?

Building control issues one certificate for the finished conversion, so the interior work must also be inspected. We tell you which stages to book.

Nearby

Read more: Dormer Shell Conversions · cost guide · planning rules

Call freeGet a guide price