
Dormer Shell Conversions in Reigate
If your Reigate home needs another bedroom or a place to work, the loft is usually the cheapest space to gain. This page covers a dormer shell conversion in Reigate: price, planning and timescale.
What does a dormer shell conversion cost in Reigate?
Budget £20,245 to £35,745 for a dormer shell conversion in Reigate. Your written quote will be a fixed price based on a survey of your roof, not a per-square-metre guess.
Will it need planning permission in Reigate?
Planning rules in Reigate are the national ones for England: 40 cubic metres of added roof volume for a terrace, 50 for a semi or detached house, nothing forward of the roof slope facing the road, and no balconies.
Planning and permitted development rules are the same for a shell as for a full conversion; building control signs off the finished project.
What is included?
A dormer shell conversion completes the structural work, the dormer, the roof coverings and the windows, leaving the interior for you or your own trades to finish.
- Steel beams and new floor joists installed
- Stair opening formed; staircase optional
- Windows and roof windows fitted
- Roof coverings, cladding and flashings finished
Dormer conversions in Reigate
With around 22,000 residents, Reigate gives us a steady flow of enquiries. Many commuter-belt streets are 1930s to 1960s houses with generous roof pitches, which tend to give good head height for a dormer.
How it works
- Free surveyA surveyor visits, measures the roof and tells you plainly what will and will not work.
- Fixed quoteA written, itemised price with the drawings it is based on.
- PaperworkBuilding regulations, lawful development or planning, and party wall notices.
- ConstructionMost of the work is done from the scaffold; we break through for the stairs near the end.
Questions about a dormer shell conversion in Reigate
Can we stay in the house during the work?
Yes. Most of the build is done from the scaffold through the roof. The disruptive part is fitting the new stairs, which usually takes a few days near the end.
Who do I contract with?
Your contract is with S&K Property Investments and Improvement Ltd. The work is carried out by our vetted subcontract teams under our supervision, and we remain responsible for it.
Is the survey free?
Yes. The survey and written quote are free and you are under no obligation to go ahead.
How long does a dormer shell conversion take?
On site, 3 to 5 weeks. Design and approvals usually add four to eight weeks before the start date.
Who gets the completion certificate?
Building control issues one certificate for the finished conversion, so the interior work must also be inspected. We tell you which stages to book.
Nearby
- Dormer Shell in Redhill
- Dormer Shell in Horley
- Dormer Shell in Dorking
- Dormer Shell in Banstead
- All dormer services in Reigate
- Dormer Shell across Surrey
Read more: Dormer Shell Conversions · cost guide · planning rules