Dormer Loft Conversions
Timber-framed dormer under construction with scaffolding

Dormer Shell Conversions in Lofthouse

We build dormer shell conversions for homeowners in Lofthouse and across West Yorkshire. Dormers are all we do, so the design, the structure and the paperwork are routine for our teams.

What does a dormer shell conversion cost in Lofthouse?

£16,995 to £29,995Guide price for a typical project in Lofthouse, 2026.

In Lofthouse, a dormer shell conversion typically costs between £16,995 and £29,995. The figure moves with the size of the dormer, the finish you choose and whether you add a bathroom.

Will it need planning permission in Lofthouse?

Before designing anything for a Lofthouse property we check three things: whether permitted development rights are intact, whether the house is in a conservation area, and how much roof volume has already been used.

Planning and permitted development rules are the same for a shell as for a full conversion; building control signs off the finished project.

Dormer conversions in Lofthouse

Stone and brick terraces with slate roofs are common across Yorkshire, alongside inter-war semis on the edges of towns. Lofthouse itself is home to roughly 23,000 people, about 3 miles from Wakefield.

What is included?

A dormer shell conversion completes the structural work, the dormer, the roof coverings and the windows, leaving the interior for you or your own trades to finish.

  • Windows and roof windows fitted
  • Steel beams and new floor joists installed
  • Dormer built, insulated externally and made weathertight
  • Written scope of what is and is not included

How it works

  1. Free surveyA surveyor visits, measures the roof and tells you plainly what will and will not work.
  2. Fixed quoteA written, itemised price with the drawings it is based on.
  3. PaperworkBuilding regulations, lawful development or planning, and party wall notices.
  4. ConstructionMost of the work is done from the scaffold; we break through for the stairs near the end.

Questions about a dormer shell conversion in Lofthouse

Is the survey free?

Yes. The survey and written quote are free and you are under no obligation to go ahead.

Who do I contract with?

Your contract is with S&K Property Investments and Improvement Ltd. The work is carried out by our vetted subcontract teams under our supervision, and we remain responsible for it.

How long does a dormer shell conversion take?

On site, 3 to 5 weeks. Design and approvals usually add four to eight weeks before the start date.

What about bats?

Bats and their roosts are protected by law. If there are signs of bats in the loft, a licensed ecologist must survey before work starts; we will tell you if we see any at survey.

What is not included in a shell conversion?

Usually first and second fix electrics and plumbing, internal insulation and plasterboard, plastering, joinery and decoration. The written scope lists each item.

Nearby

Read more: Dormer Shell Conversions · cost guide · planning rules

Call freeGet a guide price