Full-Width Dormer Loft Conversions in Harringay

Homeowners in Harringay ask us the same three things about a full-width dormer loft conversion: what it costs, whether it needs planning permission and how long it takes. The answers are below.

What does a full-width dormer loft conversion cost in Harringay?

£52,495 to £77,495Guide price for a typical project in Harringay, 2026.

In Harringay, a full-width dormer loft conversion typically costs between £52,495 and £77,495. The figure moves with the size of the dormer, the finish you choose and whether you add a bathroom.

Will it need planning permission in Harringay?

Planning rules in Harringay are the national ones for England: 40 cubic metres of added roof volume for a terrace, 50 for a semi or detached house, nothing forward of the roof slope facing the road, and no balconies.

A full-width dormer is permitted development only while the total added volume stays within 40 cubic metres (terraced) or 50 cubic metres (semi-detached and detached).

Dormer conversions in Harringay

Inter-war semis with hipped roofs line much of outer London; they usually suit a rear dormer, often paired with a hip-to-gable. Harringay itself is home to roughly 16,500 people, about 1 miles from Wood Green.

What is included?

A full-width dormer loft conversion runs a flat-roofed dormer across the whole rear roof slope, from party wall to party wall or gable to gable.

  • Roof volume measured against permitted development limits
  • Long-span flat roof with falls designed to drain properly
  • Three or four windows, or doors with a Juliet guard
  • Steel ridge beam where the span requires it

How it works

  1. Free surveyA surveyor visits, measures the roof and tells you plainly what will and will not work.
  2. Fixed quoteA written, itemised price with the drawings it is based on.
  3. PaperworkBuilding regulations, lawful development or planning, and party wall notices.
  4. ConstructionMost of the work is done from the scaffold; we break through for the stairs near the end.

Questions about a full-width dormer loft conversion in Harringay

How long does a full-width dormer loft conversion take?

On site, 7 to 9 weeks. Design and approvals usually add four to eight weeks before the start date.

Do you cover the area around Harringay?

Yes. We work throughout Greater London, including Seven Sisters, Wood Green, Stamford Hill.

Who do I contract with?

Your contract is with S&K Property Investments and Improvement Ltd. The work is carried out by our vetted subcontract teams under our supervision, and we remain responsible for it.

Can we stay in the house during the work?

Yes. Most of the build is done from the scaffold through the roof. The disruptive part is fitting the new stairs, which usually takes a few days near the end.

How big can a full-width dormer be?

As wide as the roof, provided it sits 20cm back from the eaves, no higher than the ridge, and the added volume stays within the permitted development limit. Beyond that it needs planning permission.