Dormer Loft Conversions
Full-width box dormer across the rear roof of a semi-detached house

Full-Width Dormer Loft Conversions in Deal

Homeowners in Deal ask us the same three things about a full-width dormer loft conversion: what it costs, whether it needs planning permission and how long it takes. The answers are below.

What does a full-width dormer loft conversion cost in Deal?

£46,995 to £69,495Guide price for a typical project in Deal, 2026.

In Deal, a full-width dormer loft conversion typically costs between £46,995 and £69,495. The figure moves with the size of the dormer, the finish you choose and whether you add a bathroom.

Will it need planning permission in Deal?

Whatever the planning position in Deal, building regulations approval is always required. It covers structure, fire safety, stairs, insulation and electrics, and ends with a completion certificate you will need when you sell.

A full-width dormer is permitted development only while the total added volume stays within 40 cubic metres (terraced) or 50 cubic metres (semi-detached and detached).

Dormer conversions in Deal

Deal is one of 26 places covered by our Kent team, about 8 miles from Dover. Many commuter-belt streets are 1930s to 1960s houses with generous roof pitches, which tend to give good head height for a dormer.

What is included?

A full-width dormer loft conversion runs a flat-roofed dormer across the whole rear roof slope, from party wall to party wall or gable to gable.

  • Roof volume measured against permitted development limits
  • Cladding detailed so a wide dormer does not dominate the house
  • Dormer face set back at least 20cm from the eaves
  • Steel ridge beam where the span requires it

How it works

  1. Free surveyA surveyor visits, measures the roof and tells you plainly what will and will not work.
  2. Fixed quoteA written, itemised price with the drawings it is based on.
  3. PaperworkBuilding regulations, lawful development or planning, and party wall notices.
  4. ConstructionMost of the work is done from the scaffold; we break through for the stairs near the end.

Questions about a full-width dormer loft conversion in Deal

Can we stay in the house during the work?

Yes. Most of the build is done from the scaffold through the roof. The disruptive part is fitting the new stairs, which usually takes a few days near the end.

How long does a full-width dormer loft conversion take?

On site, 7 to 9 weeks. Design and approvals usually add four to eight weeks before the start date.

Is my loft high enough?

As a rule of thumb you need about 2.2 metres from the top of the ceiling joists to the underside of the ridge. A dormer then gives full height across most of the room.

Is the survey free?

Yes. The survey and written quote are free and you are under no obligation to go ahead.

Does a full-width dormer look too bulky?

It can if it is badly detailed. Matching cladding, a slim roof edge and well-proportioned windows make a large dormer read as part of the house.

Nearby

Read more: Full-Width Dormer Loft Conversions · cost guide · planning rules

Call freeGet a guide price