Dormer Loft Conversions
Full-width box dormer across the rear roof of a semi-detached house

Full-Width Dormer Loft Conversions in Wellington

If your Wellington home needs another bedroom or a place to work, the loft is usually the cheapest space to gain. This page covers a full-width dormer loft conversion in Wellington: price, planning and timescale.

What does a full-width dormer loft conversion cost in Wellington?

£40,745 to £60,245Guide price for a typical project in Wellington, 2026.

Budget £40,745 to £60,245 for a full-width dormer loft conversion in Wellington. Your written quote will be a fixed price based on a survey of your roof, not a per-square-metre guess.

What is included?

A full-width dormer loft conversion runs a flat-roofed dormer across the whole rear roof slope, from party wall to party wall or gable to gable.

  • Dormer face set back at least 20cm from the eaves
  • Long-span flat roof with falls designed to drain properly
  • Roof volume measured against permitted development limits
  • Three or four windows, or doors with a Juliet guard

Dormer conversions in Wellington

Wellington is one of 4 places covered by our Shropshire team, about 3 miles from Telford. Red-brick terraces and 1930s semis dominate much of the West Midlands, both well suited to a slate or tile-hung rear dormer.

Will it need planning permission in Wellington?

Before designing anything for a Wellington property we check three things: whether permitted development rights are intact, whether the house is in a conservation area, and how much roof volume has already been used.

A full-width dormer is permitted development only while the total added volume stays within 40 cubic metres (terraced) or 50 cubic metres (semi-detached and detached).

How it works

  1. Look at the loftHead height, roof type, stairs position and any previous roof additions are checked on site.
  2. Agree the designLayout, windows, cladding and specification, with a fixed price to match.
  3. Get approvalsWe submit to building control and serve notices so the start date is realistic.
  4. Build and sign offStructure, dormer, roof, stairs, rooms, then the completion certificate.

Questions about a full-width dormer loft conversion in Wellington

What will the dormer be clad in?

Usually hanging tiles or slates to match the roof, which the permitted development rules favour. Zinc, fibre-cement and render are options where planning permission is being sought anyway.

Do I need building regulations approval?

Yes, always. Building control checks the structure, fire safety, stairs, insulation and electrics, and issues a completion certificate at the end.

How long does a full-width dormer loft conversion take?

On site, 7 to 9 weeks. Design and approvals usually add four to eight weeks before the start date.

Do you deal with party wall notices?

Yes. If your home is terraced or semi-detached we prepare the notices under the Party Wall etc. Act 1996. Your neighbour may appoint a surveyor, whose reasonable fees you would pay.

How big can a full-width dormer be?

As wide as the roof, provided it sits 20cm back from the eaves, no higher than the ridge, and the added volume stays within the permitted development limit. Beyond that it needs planning permission.

Nearby

Read more: Full-Width Dormer Loft Conversions · cost guide · planning rules

Call freeGet a guide price