Dormer Loft Conversions
Full-width box dormer across the rear roof of a semi-detached house

Full-Width Dormer Loft Conversions in Surrey

Homeowners in Surrey ask us the same three things about a full-width dormer loft conversion: what it costs, whether it needs planning permission and how long it takes. The answers are below.

What does a full-width dormer loft conversion cost in Surrey?

£46,995 to £69,495Guide price for a typical project in Surrey, 2026.

Most full-width dormer loft conversion projects we price in Surrey fall between £46,995 and £69,495. Homes that need extra steel or a boiler upgrade sit towards the top of that range.

Will it need planning permission in Surrey?

Planning rules in Surrey are the national ones for England: 40 cubic metres of added roof volume for a terrace, 50 for a semi or detached house, nothing forward of the roof slope facing the road, and no balconies.

A full-width dormer is permitted development only while the total added volume stays within 40 cubic metres (terraced) or 50 cubic metres (semi-detached and detached).

Dormer conversions in Surrey

Our Surrey team covers 27 towns and cities, including Woking and Guildford. Many commuter-belt streets are 1930s to 1960s houses with generous roof pitches, which tend to give good head height for a dormer.

What is included?

A full-width dormer loft conversion runs a flat-roofed dormer across the whole rear roof slope, from party wall to party wall or gable to gable.

  • Long-span flat roof with falls designed to drain properly
  • Dormer face set back at least 20cm from the eaves
  • Three or four windows, or doors with a Juliet guard
  • Roof volume measured against permitted development limits

How it works

  1. Look at the loftHead height, roof type, stairs position and any previous roof additions are checked on site.
  2. Agree the designLayout, windows, cladding and specification, with a fixed price to match.
  3. Get approvalsWe submit to building control and serve notices so the start date is realistic.
  4. Build and sign offStructure, dormer, roof, stairs, rooms, then the completion certificate.

Questions about a full-width dormer loft conversion in Surrey

Do I need building regulations approval?

Yes, always. Building control checks the structure, fire safety, stairs, insulation and electrics, and issues a completion certificate at the end.

Who do I contract with?

Your contract is with S&K Property Investments and Improvement Ltd. The work is carried out by our vetted subcontract teams under our supervision, and we remain responsible for it.

How long does a full-width dormer loft conversion take?

On site, 7 to 9 weeks. Design and approvals usually add four to eight weeks before the start date.

Do you deal with party wall notices?

Yes. If your home is terraced or semi-detached we prepare the notices under the Party Wall etc. Act 1996. Your neighbour may appoint a surveyor, whose reasonable fees you would pay.

How big can a full-width dormer be?

As wide as the roof, provided it sits 20cm back from the eaves, no higher than the ridge, and the added volume stays within the permitted development limit. Beyond that it needs planning permission.

Places covered by our Surrey team

Read more: Full-Width Dormer Loft Conversions · cost guide · planning rules

Call freeGet a guide price