
Hip-to-Gable and Rear Dormer Conversions in Pimlico
A hip-to-gable and rear dormer conversion is one of the most cost-effective ways to add a bedroom to a house in Pimlico without losing garden. Here is what it costs locally, what the rules are and how we work.
What does a hip-to-gable and rear dormer conversion cost in Pimlico?
In Pimlico, a hip-to-gable and rear dormer conversion typically costs between £64,995 and £93,745. The figure moves with the size of the dormer, the finish you choose and whether you add a bathroom.
Dormer conversions in Pimlico
We cover the whole of Pimlico, about 1 miles from City of Westminster. Inter-war semis with hipped roofs line much of outer London; they usually suit a rear dormer, often paired with a hip-to-gable.
What is included?
A hip-to-gable and rear dormer conversion rebuilds the sloping side of a hipped roof as a vertical gable wall, then adds a dormer across the enlarged rear slope.
- Combined volume checked against the 50 cubic metre limit
- Steel ridge and floor beams to engineer's design
- Rear dormer built across the widened roof
- Hip rebuilt as a gable in brick, block or tile-hung timber frame
Will it need planning permission in Pimlico?
Whatever the planning position in Pimlico, building regulations approval is always required. It covers structure, fire safety, stairs, insulation and electrics, and ends with a completion certificate you will need when you sell.
On a semi-detached or detached house the hip-to-gable and the dormer together are usually permitted development if their combined volume is within 50 cubic metres.
How it works
- Look at the loftHead height, roof type, stairs position and any previous roof additions are checked on site.
- Agree the designLayout, windows, cladding and specification, with a fixed price to match.
- Get approvalsWe submit to building control and serve notices so the start date is realistic.
- Build and sign offStructure, dormer, roof, stairs, rooms, then the completion certificate.
Questions about a hip-to-gable and rear dormer conversion in Pimlico
How long does a hip-to-gable and rear dormer conversion take?
On site, 8 to 11 weeks. Design and approvals usually add four to eight weeks before the start date.
Who do I contract with?
Your contract is with S&K Property Investments and Improvement Ltd. The work is carried out by our vetted subcontract teams under our supervision, and we remain responsible for it.
Do you cover the area around Pimlico?
Yes. We work throughout Greater London, including City of Westminster, Battersea, Chelsea.
Do I need planning permission in Pimlico?
Usually not for a rear dormer on a house. It is normally permitted development within the volume limits. Flats, conservation areas, listed buildings and front dormers facing a road do need permission.
Why combine a hip-to-gable with a dormer?
On a hipped roof, a dormer alone often leaves the stairs with no headroom. Building up the gable makes space for the stairs and widens the rear slope, so the dormer can be larger.
Nearby
- Hip-to-Gable and Rear Dormer in City of Westminster
- Hip-to-Gable and Rear Dormer in Battersea
- Hip-to-Gable and Rear Dormer in Chelsea
- Hip-to-Gable and Rear Dormer in London
- All dormer services in Pimlico
- Hip-to-Gable and Rear Dormer across Greater London
Read more: Hip-to-Gable and Rear Dormer Conversions · cost guide · planning rules