Dormer Loft Conversions
Rear dormer with French doors and a glass Juliet balcony guard

Juliet Balcony Dormers in March

We build Juliet balcony dormers for homeowners in March and across Cambridgeshire. Dormers are all we do, so the design, the structure and the paperwork are routine for our teams.

What does a Juliet balcony dormer cost in March?

£1,495 to £3,745Guide price for this element in March, 2026.

In March, a Juliet balcony dormer typically costs between £1,495 and £3,745. The figure moves with the size of the dormer, the finish you choose and whether you add a bathroom.

Dormer conversions in March

With around 21,000 residents, March gives us a steady flow of enquiries. Chalet bungalows and inter-war semis are common in this part of the country, and both are regular dormer projects.

What is included?

A Juliet balcony dormer has full-height inward-opening doors in the dormer face with a guard rail or glass panel across the opening, and no platform to stand on.

  • Works with rear and L-shaped dormers
  • French or sliding doors opening into the room
  • Guard designed to Approved Document K loads
  • Glass or steel guard at least 1100mm high

Will it need planning permission in March?

Planning rules in March are the national ones for England: 40 cubic metres of added roof volume for a terrace, 50 for a semi or detached house, nothing forward of the roof slope facing the road, and no balconies.

A Juliet guard with no platform is generally accepted as permitted development; any raised platform or true balcony requires planning permission.

How it works

  1. Free surveyA surveyor visits, measures the roof and tells you plainly what will and will not work.
  2. Fixed quoteA written, itemised price with the drawings it is based on.
  3. PaperworkBuilding regulations, lawful development or planning, and party wall notices.
  4. ConstructionMost of the work is done from the scaffold; we break through for the stairs near the end.

Questions about a Juliet balcony dormer in March

Is the survey free?

Yes. The survey and written quote are free and you are under no obligation to go ahead.

How much does a Juliet balcony dormer cost in March?

Our guide price in March is £1,495 to £3,745, depending on size, specification and whether a bathroom is included. You get a fixed written quote after a survey.

What will the dormer be clad in?

Usually hanging tiles or slates to match the roof, which the permitted development rules favour. Zinc, fibre-cement and render are options where planning permission is being sought anyway.

Is my loft high enough?

As a rule of thumb you need about 2.2 metres from the top of the ceiling joists to the underside of the ridge. A dormer then gives full height across most of the room.

What is the difference between a Juliet and a balcony?

A Juliet balcony is only a guard across an opening. A balcony has a floor you can stand on, counts as a raised platform, and always needs planning permission.

Nearby

Read more: Juliet Balcony Dormers · cost guide · planning rules

Call freeGet a guide price