Thinking about a Juliet balcony dormer in Briton Ferry? We survey, design, get the approvals and build, and you get one fixed written quote before any work starts.

What does a Juliet balcony dormer cost in Briton Ferry?

£1,495 to £3,245Guide price for this element in Briton Ferry, 2026.

Expect to pay around £1,495 to £3,245 in Briton Ferry. Steelwork, stairs and the dormer structure are the larger costs; decoration and flooring are the smaller ones.

Will it need planning permission in Briton Ferry?

Briton Ferry is in Wales, which has its own permitted development order. Many rear dormers on houses still need no planning application, but the limits differ from England's, so we confirm the position with the local planning authority first.

A Juliet guard with no platform is generally accepted as permitted development; any raised platform or true balcony requires planning permission.

Dormer conversions in Briton Ferry

Stone and rendered terraces with slate roofs are typical across much of Wales, and a slate-hung dormer is usually the best visual match. Briton Ferry itself is home to roughly 35,000 people, about 2 miles from Neath.

What is included?

A Juliet balcony dormer has full-height inward-opening doors in the dormer face with a guard rail or glass panel across the opening, and no platform to stand on.

  • Glass or steel guard at least 1100mm high
  • Works with rear and L-shaped dormers
  • Fixings into structural framing, not just cladding
  • Guard designed to Approved Document K loads

How it works

  1. Free surveyA surveyor visits, measures the roof and tells you plainly what will and will not work.
  2. Fixed quoteA written, itemised price with the drawings it is based on.
  3. PaperworkBuilding regulations, lawful development or planning, and party wall notices.
  4. ConstructionMost of the work is done from the scaffold; we break through for the stairs near the end.

Questions about a Juliet balcony dormer in Briton Ferry

Do I need building regulations approval?

Yes, always. Building control checks the structure, fire safety, stairs, insulation and electrics, and issues a completion certificate at the end.

What will the dormer be clad in?

Usually hanging tiles or slates to match the roof, which the permitted development rules favour. Zinc, fibre-cement and render are options where planning permission is being sought anyway.

Who do I contract with?

Your contract is with S&K Property Investments and Improvement Ltd. The work is carried out by our vetted subcontract teams under our supervision, and we remain responsible for it.

How long does a Juliet balcony dormer take?

On site, Added within the main build. Design and approvals usually add four to eight weeks before the start date.

What is the difference between a Juliet and a balcony?

A Juliet balcony is only a guard across an opening. A balcony has a floor you can stand on, counts as a raised platform, and always needs planning permission.

Nearby

Read more: Juliet Balcony Dormers · cost guide · planning rules

Call freeGet a guide price