Dormer Loft Conversions
Slate-clad flat-roofed rear dormer on a brick terraced house

Rear Dormer Loft Conversions in Wokingham

Our Berkshire team carries out rear dormer loft conversions in Wokingham from first survey to building control completion certificate, with the same site lead throughout.

What does a rear dormer loft conversion cost in Wokingham?

£39,245 to £61,495Guide price for a typical project in Wokingham, 2026.

Most rear dormer loft conversion projects we price in Berkshire fall between £39,245 and £61,495. Homes that need extra steel or a boiler upgrade sit towards the top of that range.

Will it need planning permission in Wokingham?

Whatever the planning position in Wokingham, building regulations approval is always required. It covers structure, fire safety, stairs, insulation and electrics, and ends with a completion certificate you will need when you sell.

Most rear dormers on houses fall within permitted development, provided the added roof volume stays within 40 cubic metres on a terrace or 50 cubic metres on a semi or detached house.

What is included?

A rear dormer loft conversion is a flat-roofed extension built out from the back slope of your roof, giving a full-height room where there was only sloping loft space.

  • New staircase positioned over the existing stairs where possible
  • Flat roof in GRP or EPDM with a manufacturer-backed membrane
  • Cladding in tile, slate, zinc or fibre-cement to suit the house
  • New floor structure and steel beams designed by a structural engineer

Dormer conversions in Wokingham

Wokingham has a population of about 41,000. Many commuter-belt streets are 1930s to 1960s houses with generous roof pitches, which tend to give good head height for a dormer.

How it works

  1. Look at the loftHead height, roof type, stairs position and any previous roof additions are checked on site.
  2. Agree the designLayout, windows, cladding and specification, with a fixed price to match.
  3. Get approvalsWe submit to building control and serve notices so the start date is realistic.
  4. Build and sign offStructure, dormer, roof, stairs, rooms, then the completion certificate.

Questions about a rear dormer loft conversion in Wokingham

How long does a rear dormer loft conversion take?

On site, 6 to 8 weeks. Design and approvals usually add four to eight weeks before the start date.

Is my loft high enough?

As a rule of thumb you need about 2.2 metres from the top of the ceiling joists to the underside of the ridge. A dormer then gives full height across most of the room.

What about bats?

Bats and their roosts are protected by law. If there are signs of bats in the loft, a licensed ecologist must survey before work starts; we will tell you if we see any at survey.

Who do I contract with?

Your contract is with S&K Property Investments and Improvement Ltd. The work is carried out by our vetted subcontract teams under our supervision, and we remain responsible for it.

Does a rear dormer need planning permission?

Usually not on a house in England. Rear dormers are normally permitted development if they stay within the volume limits, sit at least 20cm back from the eaves and use materials similar in appearance to the house.

Nearby

Read more: Rear Dormer Loft Conversions · cost guide · planning rules

Call freeGet a guide price