Thinking about a rear dormer loft conversion in Christchurch? We survey, design, get the approvals and build, and you get one fixed written quote before any work starts.
What does a rear dormer loft conversion cost in Christchurch?
Our guide price for a rear dormer loft conversion in Christchurch is £35,995 to £56,745. That reflects labour and material costs in the South West, which sit close to the national average.
Dormer conversions in Christchurch
Christchurch is one of 7 places covered by our Dorset team, about 4 miles from Bournemouth. Bungalows are a big part of the housing stock here, so dormers that turn a single storey into a two-storey home are a frequent request.
What is included?
A rear dormer loft conversion is a flat-roofed extension built out from the back slope of your roof, giving a full-height room where there was only sloping loft space.
- Flat roof in GRP or EPDM with a manufacturer-backed membrane
- New floor structure and steel beams designed by a structural engineer
- Cladding in tile, slate, zinc or fibre-cement to suit the house
- New staircase positioned over the existing stairs where possible
Will it need planning permission in Christchurch?
Before designing anything for a Christchurch property we check three things: whether permitted development rights are intact, whether the house is in a conservation area, and how much roof volume has already been used.
Most rear dormers on houses fall within permitted development, provided the added roof volume stays within 40 cubic metres on a terrace or 50 cubic metres on a semi or detached house.
How it works
- SurveyWe measure the loft, check head height and structure, and confirm what planning route applies.
- Design and quoteYou receive drawings, a specification and one fixed written price.
- ApprovalsWe deal with building control, party wall notices and any planning paperwork.
- BuildScaffold up, steel in, dormer built and made watertight, then stairs and interior.
Questions about a rear dormer loft conversion in Christchurch
Do you cover the area around Christchurch?
Yes. We work throughout Dorset, including Bournemouth, Ferndown, Poole.
How long does a rear dormer loft conversion take?
On site, 6 to 8 weeks. Design and approvals usually add four to eight weeks before the start date.
Can we stay in the house during the work?
Yes. Most of the build is done from the scaffold through the roof. The disruptive part is fitting the new stairs, which usually takes a few days near the end.
What will the dormer be clad in?
Usually hanging tiles or slates to match the roof, which the permitted development rules favour. Zinc, fibre-cement and render are options where planning permission is being sought anyway.
How much floor space does a rear dormer add?
A rear dormer typically turns a loft into a room of 15 to 25 square metres of full-height floor area on an average three-bed house, enough for a double bedroom and often an en-suite.
Nearby
- Rear Dormer in Bournemouth
- Rear Dormer in Ferndown
- Rear Dormer in Poole
- Rear Dormer in Wimborne Minster
- All dormer services in Christchurch
- Rear Dormer across Dorset