Dormer Loft Conversions
Slate-clad flat-roofed rear dormer on a brick terraced house

Rear Dormer Loft Conversions in Mid Wales

Our Mid Wales team carries out rear dormer loft conversions in Mid Wales from first survey to building control completion certificate, with the same site lead throughout.

What does a rear dormer loft conversion cost in Mid Wales?

£32,245 to £50,495Guide price for a typical project in Mid Wales, 2026.

In Mid Wales, a rear dormer loft conversion typically costs between £32,245 and £50,495. The figure moves with the size of the dormer, the finish you choose and whether you add a bathroom.

Dormer conversions in Mid Wales

Our Mid Wales team covers 1 towns and cities, including Aberystwyth. Stone and rendered terraces with slate roofs are typical across much of Wales, and a slate-hung dormer is usually the best visual match.

Will it need planning permission in Mid Wales?

In Mid Wales, as everywhere in Wales, building regulations approval is required for a loft conversion whatever the planning position. Wales has its own Approved Documents, and we design to those.

Most rear dormers on houses fall within permitted development, provided the added roof volume stays within 40 cubic metres on a terrace or 50 cubic metres on a semi or detached house.

What is included?

A rear dormer loft conversion is a flat-roofed extension built out from the back slope of your roof, giving a full-height room where there was only sloping loft space.

  • Timber-framed dormer insulated to current Part L targets
  • Cladding in tile, slate, zinc or fibre-cement to suit the house
  • Flat roof in GRP or EPDM with a manufacturer-backed membrane
  • New floor structure and steel beams designed by a structural engineer

How it works

  1. Free surveyA surveyor visits, measures the roof and tells you plainly what will and will not work.
  2. Fixed quoteA written, itemised price with the drawings it is based on.
  3. PaperworkBuilding regulations, lawful development or planning, and party wall notices.
  4. ConstructionMost of the work is done from the scaffold; we break through for the stairs near the end.

Questions about a rear dormer loft conversion in Mid Wales

Do you cover the area around Mid Wales?

Yes. We work throughout Mid Wales.

What will the dormer be clad in?

Usually hanging tiles or slates to match the roof, which the permitted development rules favour. Zinc, fibre-cement and render are options where planning permission is being sought anyway.

How long does a rear dormer loft conversion take?

On site, 6 to 8 weeks. Design and approvals usually add four to eight weeks before the start date.

How are payments staged?

In stages tied to progress, set out in your quote: a deposit, then payments as the structure, weathertight shell and interior are completed. We do not ask for the full price up front.

Does a rear dormer need planning permission?

Usually not on a house in England. Rear dormers are normally permitted development if they stay within the volume limits, sit at least 20cm back from the eaves and use materials similar in appearance to the house.

Places covered by our Mid Wales team

Read more: Rear Dormer Loft Conversions · cost guide · planning rules

Call freeGet a guide price