Dormer Loft Conversions
Slate-clad flat-roofed rear dormer on a brick terraced house

Rear Dormer Loft Conversions in Maltby

We build rear dormer loft conversions for homeowners in Maltby and across South Yorkshire. Dormers are all we do, so the design, the structure and the paperwork are routine for our teams.

What does a rear dormer loft conversion cost in Maltby?

£32,995 to £51,745Guide price for a typical project in Maltby, 2026.

In Maltby, a rear dormer loft conversion typically costs between £32,995 and £51,745. The figure moves with the size of the dormer, the finish you choose and whether you add a bathroom.

Will it need planning permission in Maltby?

Before designing anything for a Maltby property we check three things: whether permitted development rights are intact, whether the house is in a conservation area, and how much roof volume has already been used.

Most rear dormers on houses fall within permitted development, provided the added roof volume stays within 40 cubic metres on a terrace or 50 cubic metres on a semi or detached house.

Dormer conversions in Maltby

Maltby has a population of about 17,500. Through-terraces and back-to-backs need careful stair planning, but many Yorkshire roofs have the pitch for a good dormer room.

What is included?

A rear dormer loft conversion is a flat-roofed extension built out from the back slope of your roof, giving a full-height room where there was only sloping loft space.

  • Timber-framed dormer insulated to current Part L targets
  • Flat roof in GRP or EPDM with a manufacturer-backed membrane
  • New floor structure and steel beams designed by a structural engineer
  • New staircase positioned over the existing stairs where possible

How it works

  1. Look at the loftHead height, roof type, stairs position and any previous roof additions are checked on site.
  2. Agree the designLayout, windows, cladding and specification, with a fixed price to match.
  3. Get approvalsWe submit to building control and serve notices so the start date is realistic.
  4. Build and sign offStructure, dormer, roof, stairs, rooms, then the completion certificate.

Questions about a rear dormer loft conversion in Maltby

Do I need building regulations approval?

Yes, always. Building control checks the structure, fire safety, stairs, insulation and electrics, and issues a completion certificate at the end.

How long does a rear dormer loft conversion take?

On site, 6 to 8 weeks. Design and approvals usually add four to eight weeks before the start date.

Who do I contract with?

Your contract is with S&K Property Investments and Improvement Ltd. The work is carried out by our vetted subcontract teams under our supervision, and we remain responsible for it.

Is the survey free?

Yes. The survey and written quote are free and you are under no obligation to go ahead.

How much floor space does a rear dormer add?

A rear dormer typically turns a loft into a room of 15 to 25 square metres of full-height floor area on an average three-bed house, enough for a double bedroom and often an en-suite.

Nearby

Read more: Rear Dormer Loft Conversions · cost guide · planning rules

Call freeGet a guide price