Dormer Loft Conversions
Slate-clad flat-roofed rear dormer on a brick terraced house

Rear Dormer Loft Conversions in East Grinstead

Thinking about a rear dormer loft conversion in East Grinstead? We survey, design, get the approvals and build, and you get one fixed written quote before any work starts.

What does a rear dormer loft conversion cost in East Grinstead?

£39,245 to £61,495Guide price for a typical project in East Grinstead, 2026.

In East Grinstead, a rear dormer loft conversion typically costs between £39,245 and £61,495. The figure moves with the size of the dormer, the finish you choose and whether you add a bathroom.

Dormer conversions in East Grinstead

We cover the whole of East Grinstead, about 8 miles from Crawley. Many commuter-belt streets are 1930s to 1960s houses with generous roof pitches, which tend to give good head height for a dormer.

Will it need planning permission in East Grinstead?

Before designing anything for a East Grinstead property we check three things: whether permitted development rights are intact, whether the house is in a conservation area, and how much roof volume has already been used.

Most rear dormers on houses fall within permitted development, provided the added roof volume stays within 40 cubic metres on a terrace or 50 cubic metres on a semi or detached house.

What is included?

A rear dormer loft conversion is a flat-roofed extension built out from the back slope of your roof, giving a full-height room where there was only sloping loft space.

  • New floor structure and steel beams designed by a structural engineer
  • Cladding in tile, slate, zinc or fibre-cement to suit the house
  • New staircase positioned over the existing stairs where possible
  • Flat roof in GRP or EPDM with a manufacturer-backed membrane

How it works

  1. SurveyWe measure the loft, check head height and structure, and confirm what planning route applies.
  2. Design and quoteYou receive drawings, a specification and one fixed written price.
  3. ApprovalsWe deal with building control, party wall notices and any planning paperwork.
  4. BuildScaffold up, steel in, dormer built and made watertight, then stairs and interior.

Questions about a rear dormer loft conversion in East Grinstead

Who do I contract with?

Your contract is with S&K Property Investments and Improvement Ltd. The work is carried out by our vetted subcontract teams under our supervision, and we remain responsible for it.

Do I need planning permission in East Grinstead?

Usually not for a rear dormer on a house. It is normally permitted development within the volume limits. Flats, conservation areas, listed buildings and front dormers facing a road do need permission.

What will the dormer be clad in?

Usually hanging tiles or slates to match the roof, which the permitted development rules favour. Zinc, fibre-cement and render are options where planning permission is being sought anyway.

How long does a rear dormer loft conversion take?

On site, 6 to 8 weeks. Design and approvals usually add four to eight weeks before the start date.

How much floor space does a rear dormer add?

A rear dormer typically turns a loft into a room of 15 to 25 square metres of full-height floor area on an average three-bed house, enough for a double bedroom and often an en-suite.

Nearby

Read more: Rear Dormer Loft Conversions · cost guide · planning rules

Call freeGet a guide price