
Rear Dormer Loft Conversions in Trowbridge
We build rear dormer loft conversions for homeowners in Trowbridge and across Wiltshire. Dormers are all we do, so the design, the structure and the paperwork are routine for our teams.
What does a rear dormer loft conversion cost in Trowbridge?
Our guide price for a rear dormer loft conversion in Trowbridge is £35,995 to £56,745. That reflects labour and material costs in the South West, which sit close to the national average.
What is included?
A rear dormer loft conversion is a flat-roofed extension built out from the back slope of your roof, giving a full-height room where there was only sloping loft space.
- New floor structure and steel beams designed by a structural engineer
- Timber-framed dormer insulated to current Part L targets
- Cladding in tile, slate, zinc or fibre-cement to suit the house
- New staircase positioned over the existing stairs where possible
Dormer conversions in Trowbridge
Trowbridge has a population of about 41,000. Bungalows are a big part of the housing stock here, so dormers that turn a single storey into a two-storey home are a frequent request.
Will it need planning permission in Trowbridge?
Planning rules in Trowbridge are the national ones for England: 40 cubic metres of added roof volume for a terrace, 50 for a semi or detached house, nothing forward of the roof slope facing the road, and no balconies.
Most rear dormers on houses fall within permitted development, provided the added roof volume stays within 40 cubic metres on a terrace or 50 cubic metres on a semi or detached house.
How it works
- Look at the loftHead height, roof type, stairs position and any previous roof additions are checked on site.
- Agree the designLayout, windows, cladding and specification, with a fixed price to match.
- Get approvalsWe submit to building control and serve notices so the start date is realistic.
- Build and sign offStructure, dormer, roof, stairs, rooms, then the completion certificate.
Questions about a rear dormer loft conversion in Trowbridge
How long does a rear dormer loft conversion take?
On site, 6 to 8 weeks. Design and approvals usually add four to eight weeks before the start date.
Do I need building regulations approval?
Yes, always. Building control checks the structure, fire safety, stairs, insulation and electrics, and issues a completion certificate at the end.
Do you cover the area around Trowbridge?
Yes. We work throughout Wiltshire, including Westbury, Melksham, Warminster.
Can we stay in the house during the work?
Yes. Most of the build is done from the scaffold through the roof. The disruptive part is fitting the new stairs, which usually takes a few days near the end.
How much floor space does a rear dormer add?
A rear dormer typically turns a loft into a room of 15 to 25 square metres of full-height floor area on an average three-bed house, enough for a double bedroom and often an en-suite.
Nearby
- Rear Dormer in Westbury
- Rear Dormer in Melksham
- Rear Dormer in Warminster
- Rear Dormer in Devizes
- All dormer services in Trowbridge
- Rear Dormer across Wiltshire
Read more: Rear Dormer Loft Conversions · cost guide · planning rules