
Side Dormer Loft Conversions in Exeter
Homeowners in Exeter ask us the same three things about a side dormer loft conversion: what it costs, whether it needs planning permission and how long it takes. The answers are below.
What does a side dormer loft conversion cost in Exeter?
Most side dormer loft conversion projects we price in Devon fall between £35,995 and £51,495. Homes that need extra steel or a boiler upgrade sit towards the top of that range.
Dormer conversions in Exeter
We cover the whole of Exeter, about 36 miles from Plymouth. Stone-fronted terraces, inter-war semis and a lot of bungalows: the South West has a mixed housing stock, and dormer design needs to follow the street.
What is included?
A side dormer loft conversion adds a dormer to the side slope of a hipped roof, most often to create headroom for the staircase or a bathroom.
- Tile-hung or slate-hung cheeks to match the main roof
- Obscure glazing to side-facing windows as the rules require
- Structural design for the altered hip rafters
- Headroom of 2.0 metres created over the new stairs
Will it need planning permission in Exeter?
Exeter is covered by England's permitted development rules. A dormer on a house usually needs no planning application if it stays within the volume limit, does not face the highway and uses materials similar in appearance to the existing roof.
A side dormer can be permitted development unless that roof slope is the principal elevation facing a highway, in which case planning permission is needed.
How it works
- SurveyWe measure the loft, check head height and structure, and confirm what planning route applies.
- Design and quoteYou receive drawings, a specification and one fixed written price.
- ApprovalsWe deal with building control, party wall notices and any planning paperwork.
- BuildScaffold up, steel in, dormer built and made watertight, then stairs and interior.
Questions about a side dormer loft conversion in Exeter
What will the dormer be clad in?
Usually hanging tiles or slates to match the roof, which the permitted development rules favour. Zinc, fibre-cement and render are options where planning permission is being sought anyway.
Is my loft high enough?
As a rule of thumb you need about 2.2 metres from the top of the ceiling joists to the underside of the ridge. A dormer then gives full height across most of the room.
How long does a side dormer loft conversion take?
On site, 6 to 9 weeks. Design and approvals usually add four to eight weeks before the start date.
Can we stay in the house during the work?
Yes. Most of the build is done from the scaffold through the roof. The disruptive part is fitting the new stairs, which usually takes a few days near the end.
Side dormer or hip-to-gable: which is better?
A hip-to-gable gives more floor area; a side dormer costs less and changes the look of the house less. If you only need headroom for stairs, a side dormer is usually enough.
Nearby
- Side Dormer in Heavitree
- Side Dormer in Exmouth
- Side Dormer in Tiverton
- Side Dormer in Newton Abbot
- All dormer services in Exeter
- Side Dormer across Devon
Read more: Side Dormer Loft Conversions · cost guide · planning rules