
Side Dormer Loft Conversions in Notting Hill
Homeowners in Notting Hill ask us the same three things about a side dormer loft conversion: what it costs, whether it needs planning permission and how long it takes. The answers are below.
What does a side dormer loft conversion cost in Notting Hill?
Expect to pay around £43,745 to £62,495 in Notting Hill. Steelwork, stairs and the dormer structure are the larger costs; decoration and flooring are the smaller ones.
Will it need planning permission in Notting Hill?
Before designing anything for a Notting Hill property we check three things: whether permitted development rights are intact, whether the house is in a conservation area, and how much roof volume has already been used.
A side dormer can be permitted development unless that roof slope is the principal elevation facing a highway, in which case planning permission is needed.
What is included?
A side dormer loft conversion adds a dormer to the side slope of a hipped roof, most often to create headroom for the staircase or a bathroom.
- Headroom of 2.0 metres created over the new stairs
- Structural design for the altered hip rafters
- Tile-hung or slate-hung cheeks to match the main roof
- Can be combined with a rear dormer in one build
Dormer conversions in Notting Hill
We cover the whole of Notting Hill, about 1 miles from Shepherds Bush. Victorian and Edwardian terraces with two-storey rear outriggers are the classic candidates here, which is why L-shaped dormers are so common on London streets.
How it works
- Look at the loftHead height, roof type, stairs position and any previous roof additions are checked on site.
- Agree the designLayout, windows, cladding and specification, with a fixed price to match.
- Get approvalsWe submit to building control and serve notices so the start date is realistic.
- Build and sign offStructure, dormer, roof, stairs, rooms, then the completion certificate.
Questions about a side dormer loft conversion in Notting Hill
Will a dormer add value to my Notting Hill home?
An extra bedroom generally adds value, but how much depends on the street and the local market. A local estate agent can tell you what four-bedroom homes sell for near you.
Can we stay in the house during the work?
Yes. Most of the build is done from the scaffold through the roof. The disruptive part is fitting the new stairs, which usually takes a few days near the end.
Who do I contract with?
Your contract is with S&K Property Investments and Improvement Ltd. The work is carried out by our vetted subcontract teams under our supervision, and we remain responsible for it.
How long does a side dormer loft conversion take?
On site, 6 to 9 weeks. Design and approvals usually add four to eight weeks before the start date.
Can a side dormer have a clear window?
Only if the opening part is more than 1.7 metres above the floor. Otherwise side-facing windows must be obscure-glazed and non-opening to stay within permitted development.
Nearby
- Side Dormer in Shepherds Bush
- Side Dormer in Bayswater
- Side Dormer in Willesden
- Side Dormer in Fulham
- All dormer services in Notting Hill
- Side Dormer across Greater London
Read more: Side Dormer Loft Conversions · cost guide · planning rules