Dormer Loft Conversions
Tile-hung side dormer on the hipped roof of a rendered house

Side Dormer Loft Conversions in Sandown

A side dormer loft conversion is one of the most cost-effective ways to add a bedroom to a house in Sandown without losing garden. Here is what it costs locally, what the rules are and how we work.

What does a side dormer loft conversion cost in Sandown?

£39,245 to £55,995Guide price for a typical project in Sandown, 2026.

Budget £39,245 to £55,995 for a side dormer loft conversion in Sandown. Your written quote will be a fixed price based on a survey of your roof, not a per-square-metre guess.

Will it need planning permission in Sandown?

Sandown is covered by England's permitted development rules. A dormer on a house usually needs no planning application if it stays within the volume limit, does not face the highway and uses materials similar in appearance to the existing roof.

A side dormer can be permitted development unless that roof slope is the principal elevation facing a highway, in which case planning permission is needed.

Dormer conversions in Sandown

We cover the whole of Sandown, about 10 miles from Gosport. 1930s semis and chalet bungalows are widespread across the South East, and both take a rear dormer well.

What is included?

A side dormer loft conversion adds a dormer to the side slope of a hipped roof, most often to create headroom for the staircase or a bathroom.

  • Headroom of 2.0 metres created over the new stairs
  • Obscure glazing to side-facing windows as the rules require
  • Tile-hung or slate-hung cheeks to match the main roof
  • Structural design for the altered hip rafters

How it works

  1. SurveyWe measure the loft, check head height and structure, and confirm what planning route applies.
  2. Design and quoteYou receive drawings, a specification and one fixed written price.
  3. ApprovalsWe deal with building control, party wall notices and any planning paperwork.
  4. BuildScaffold up, steel in, dormer built and made watertight, then stairs and interior.

Questions about a side dormer loft conversion in Sandown

Is the survey free?

Yes. The survey and written quote are free and you are under no obligation to go ahead.

How long does a side dormer loft conversion take?

On site, 6 to 9 weeks. Design and approvals usually add four to eight weeks before the start date.

What about bats?

Bats and their roosts are protected by law. If there are signs of bats in the loft, a licensed ecologist must survey before work starts; we will tell you if we see any at survey.

Is my loft high enough?

As a rule of thumb you need about 2.2 metres from the top of the ceiling joists to the underside of the ridge. A dormer then gives full height across most of the room.

Can a side dormer have a clear window?

Only if the opening part is more than 1.7 metres above the floor. Otherwise side-facing windows must be obscure-glazed and non-opening to stay within permitted development.

Nearby

Read more: Side Dormer Loft Conversions · cost guide · planning rules

Call freeGet a guide price