Side Dormer Loft Conversions in Burgess Hill

Homeowners in Burgess Hill ask us the same three things about a side dormer loft conversion: what it costs, whether it needs planning permission and how long it takes. The answers are below.

What does a side dormer loft conversion cost in Burgess Hill?

£39,245 to £55,995Guide price for a typical project in Burgess Hill, 2026.

Most side dormer loft conversion projects we price in West Sussex fall between £39,245 and £55,995. Homes that need extra steel or a boiler upgrade sit towards the top of that range.

Will it need planning permission in Burgess Hill?

Planning rules in Burgess Hill are the national ones for England: 40 cubic metres of added roof volume for a terrace, 50 for a semi or detached house, nothing forward of the roof slope facing the road, and no balconies.

A side dormer can be permitted development unless that roof slope is the principal elevation facing a highway, in which case planning permission is needed.

What is included?

A side dormer loft conversion adds a dormer to the side slope of a hipped roof, most often to create headroom for the staircase or a bathroom.

  • Can be combined with a rear dormer in one build
  • Structural design for the altered hip rafters
  • Headroom of 2.0 metres created over the new stairs
  • Obscure glazing to side-facing windows as the rules require

Dormer conversions in Burgess Hill

Burgess Hill is one of 11 places covered by our West Sussex team, about 9 miles from Hove. 1930s semis and chalet bungalows are widespread across the South East, and both take a rear dormer well.

How it works

  1. Look at the loftHead height, roof type, stairs position and any previous roof additions are checked on site.
  2. Agree the designLayout, windows, cladding and specification, with a fixed price to match.
  3. Get approvalsWe submit to building control and serve notices so the start date is realistic.
  4. Build and sign offStructure, dormer, roof, stairs, rooms, then the completion certificate.

Questions about a side dormer loft conversion in Burgess Hill

How long does a side dormer loft conversion take?

On site, 6 to 9 weeks. Design and approvals usually add four to eight weeks before the start date.

Do I need building regulations approval?

Yes, always. Building control checks the structure, fire safety, stairs, insulation and electrics, and issues a completion certificate at the end.

Do you deal with party wall notices?

Yes. If your home is terraced or semi-detached we prepare the notices under the Party Wall etc. Act 1996. Your neighbour may appoint a surveyor, whose reasonable fees you would pay.

Who do I contract with?

Your contract is with S&K Property Investments and Improvement Ltd. The work is carried out by our vetted subcontract teams under our supervision, and we remain responsible for it.

Side dormer or hip-to-gable: which is better?

A hip-to-gable gives more floor area; a side dormer costs less and changes the look of the house less. If you only need headroom for stairs, a side dormer is usually enough.