Dormer Loft Conversions
Tile-hung side dormer on the hipped roof of a rendered house

Side Dormer Loft Conversions in Wiltshire

We build side dormer loft conversions for homeowners in Wiltshire and across Wiltshire. Dormers are all we do, so the design, the structure and the paperwork are routine for our teams.

What does a side dormer loft conversion cost in Wiltshire?

£35,995 to £51,495Guide price for a typical project in Wiltshire, 2026.

Budget £35,995 to £51,495 for a side dormer loft conversion in Wiltshire. Your written quote will be a fixed price based on a survey of your roof, not a per-square-metre guess.

What is included?

A side dormer loft conversion adds a dormer to the side slope of a hipped roof, most often to create headroom for the staircase or a bathroom.

  • Check on whether the side slope faces a highway
  • Structural design for the altered hip rafters
  • Headroom of 2.0 metres created over the new stairs
  • Obscure glazing to side-facing windows as the rules require

Dormer conversions in Wiltshire

Our Wiltshire team covers 9 towns and cities, including Swindon and Salisbury. Stone-fronted terraces, inter-war semis and a lot of bungalows: the South West has a mixed housing stock, and dormer design needs to follow the street.

Will it need planning permission in Wiltshire?

Most dormers on houses in Wiltshire are permitted development. The exceptions are flats and maisonettes, conservation areas and other protected land, listed buildings, and homes where the council has removed those rights.

A side dormer can be permitted development unless that roof slope is the principal elevation facing a highway, in which case planning permission is needed.

How it works

  1. Free surveyA surveyor visits, measures the roof and tells you plainly what will and will not work.
  2. Fixed quoteA written, itemised price with the drawings it is based on.
  3. PaperworkBuilding regulations, lawful development or planning, and party wall notices.
  4. ConstructionMost of the work is done from the scaffold; we break through for the stairs near the end.

Questions about a side dormer loft conversion in Wiltshire

How long does a side dormer loft conversion take?

On site, 6 to 9 weeks. Design and approvals usually add four to eight weeks before the start date.

How much does a side dormer loft conversion cost in Wiltshire?

Our guide price in Wiltshire is £35,995 to £51,495, depending on size, specification and whether a bathroom is included. You get a fixed written quote after a survey.

What about bats?

Bats and their roosts are protected by law. If there are signs of bats in the loft, a licensed ecologist must survey before work starts; we will tell you if we see any at survey.

Can we stay in the house during the work?

Yes. Most of the build is done from the scaffold through the roof. The disruptive part is fitting the new stairs, which usually takes a few days near the end.

Side dormer or hip-to-gable: which is better?

A hip-to-gable gives more floor area; a side dormer costs less and changes the look of the house less. If you only need headroom for stairs, a side dormer is usually enough.

Places covered by our Wiltshire team

Read more: Side Dormer Loft Conversions · cost guide · planning rules

Call freeGet a guide price