Dormer Loft Conversions
Tile-hung rear dormer on one of a pair of semi-detached houses

Dormer Loft Conversions in South Shields

Thinking about a dormer loft conversion in South Shields? We survey, design, get the approvals and build, and you get one fixed written quote before any work starts.

Dormer prices in South Shields

Guide prices for South Shields, adjusted for labour and material costs in the North East. Rear dormers typically cost £31,495 to £49,495 here.

ServiceGuide priceTime on site
Dormer Design, Plans and Approvals£1,495 to £3,9953 to 6 weeks for drawings
Rear Dormer Loft Conversions£31,495 to £49,4956 to 8 weeks
Front Dormer Loft Conversions£28,745 to £49,4957 to 10 weeks
L-Shaped Dormer Loft Conversions£40,495 to £61,2458 to 10 weeks
Dormer Shell Conversions£16,245 to £28,7453 to 5 weeks
Dormer Loft Conversions with En-Suite£40,495 to £62,9957 to 10 weeks
Dormer Cladding and Roofing£2,245 to £7,9953 to 10 days
Full-Width Dormer Loft Conversions£37,745 to £55,7457 to 9 weeks

About South Shields

South Shields has a population of about 84,000. Terraces, Tyneside flats and post-war semis make up much of the North East's housing; houses, not flats, benefit from permitted development rights.

Planning in South Shields

South Shields is covered by England's permitted development rules. A dormer on a house usually needs no planning application if it stays within the volume limit, does not face the highway and uses materials similar in appearance to the existing roof.

How it works

  1. Look at the loftHead height, roof type, stairs position and any previous roof additions are checked on site.
  2. Agree the designLayout, windows, cladding and specification, with a fixed price to match.
  3. Get approvalsWe submit to building control and serve notices so the start date is realistic.
  4. Build and sign offStructure, dormer, roof, stairs, rooms, then the completion certificate.

Questions people ask

How long does a dormer loft conversion take?

On site, 6 to 8 weeks for a rear dormer. Design and approvals usually add four to eight weeks before the start date.

Who do I contract with?

Your contract is with S&K Property Investments and Improvement Ltd. The work is carried out by our vetted subcontract teams under our supervision, and we remain responsible for it.

Is my loft high enough?

As a rule of thumb you need about 2.2 metres from the top of the ceiling joists to the underside of the ridge. A dormer then gives full height across most of the room.

Can we stay in the house during the work?

Yes. Most of the build is done from the scaffold through the roof. The disruptive part is fitting the new stairs, which usually takes a few days near the end.

What will the dormer be clad in?

Usually hanging tiles or slates to match the roof, which the permitted development rules favour. Zinc, fibre-cement and render are options where planning permission is being sought anyway.

Nearby towns

Call freeGet a guide price