Dormer Loft Conversions
Full-width box dormer across the rear roof of a semi-detached house

Full-Width Dormer Loft Conversions in South Shields

Our Tyne and Wear team carries out full-width dormer loft conversions in South Shields from first survey to building control completion certificate, with the same site lead throughout.

What does a full-width dormer loft conversion cost in South Shields?

£37,745 to £55,745Guide price for a typical project in South Shields, 2026.

Our guide price for a full-width dormer loft conversion in South Shields is £37,745 to £55,745. That reflects labour and material costs in the North East, which sit below the national average.

Dormer conversions in South Shields

With around 84,000 residents, South Shields gives us a steady flow of enquiries. Terraces, Tyneside flats and post-war semis make up much of the North East's housing; houses, not flats, benefit from permitted development rights.

Will it need planning permission in South Shields?

Most dormers on houses in South Shields are permitted development. The exceptions are flats and maisonettes, conservation areas and other protected land, listed buildings, and homes where the council has removed those rights.

A full-width dormer is permitted development only while the total added volume stays within 40 cubic metres (terraced) or 50 cubic metres (semi-detached and detached).

What is included?

A full-width dormer loft conversion runs a flat-roofed dormer across the whole rear roof slope, from party wall to party wall or gable to gable.

  • Long-span flat roof with falls designed to drain properly
  • Steel ridge beam where the span requires it
  • Three or four windows, or doors with a Juliet guard
  • Roof volume measured against permitted development limits

How it works

  1. SurveyWe measure the loft, check head height and structure, and confirm what planning route applies.
  2. Design and quoteYou receive drawings, a specification and one fixed written price.
  3. ApprovalsWe deal with building control, party wall notices and any planning paperwork.
  4. BuildScaffold up, steel in, dormer built and made watertight, then stairs and interior.

Questions about a full-width dormer loft conversion in South Shields

How long does a full-width dormer loft conversion take?

On site, 7 to 9 weeks. Design and approvals usually add four to eight weeks before the start date.

How are payments staged?

In stages tied to progress, set out in your quote: a deposit, then payments as the structure, weathertight shell and interior are completed. We do not ask for the full price up front.

Do you deal with party wall notices?

Yes. If your home is terraced or semi-detached we prepare the notices under the Party Wall etc. Act 1996. Your neighbour may appoint a surveyor, whose reasonable fees you would pay.

Do I need building regulations approval?

Yes, always. Building control checks the structure, fire safety, stairs, insulation and electrics, and issues a completion certificate at the end.

How big can a full-width dormer be?

As wide as the roof, provided it sits 20cm back from the eaves, no higher than the ridge, and the added volume stays within the permitted development limit. Beyond that it needs planning permission.

Nearby

Read more: Full-Width Dormer Loft Conversions · cost guide · planning rules

Call freeGet a guide price