Dormer Loft Conversions in Washington

We build dormer loft conversions for homeowners in Washington and across Tyne and Wear. Dormers are all we do, so the design, the structure and the paperwork are routine for our teams.

Dormer prices in Washington

Guide prices for Washington, adjusted for labour and material costs in the North East. Rear dormers typically cost £31,495 to £49,495 here.

ServiceGuide priceTime on site
Side Dormer Loft Conversions£31,495 to £44,9956 to 9 weeks
Hip-to-Gable and Rear Dormer Conversions£46,745 to £67,4958 to 11 weeks
Full-Width Dormer Loft Conversions£37,745 to £55,7457 to 9 weeks
Terraced House Dormer Loft Conversions£32,495 to £50,4956 to 9 weeks
Semi-Detached Dormer Loft Conversions£34,245 to £53,9956 to 10 weeks
Dormer Shell Conversions£16,245 to £28,7453 to 5 weeks
Rear Dormer Loft Conversions£31,495 to £49,4956 to 8 weeks
Pitched Roof Dormer Loft Conversions£26,995 to £52,2456 to 10 weeks

About Washington

Washington has a population of about 67,000. Brick terraces and semi-detached houses with straightforward gable roofs are typical here and usually convert well.

Planning in Washington

Most dormers on houses in Washington are permitted development. The exceptions are flats and maisonettes, conservation areas and other protected land, listed buildings, and homes where the council has removed those rights.

How it works

  1. Free surveyA surveyor visits, measures the roof and tells you plainly what will and will not work.
  2. Fixed quoteA written, itemised price with the drawings it is based on.
  3. PaperworkBuilding regulations, lawful development or planning, and party wall notices.
  4. ConstructionMost of the work is done from the scaffold; we break through for the stairs near the end.

Questions people ask

How are payments staged?

In stages tied to progress, set out in your quote: a deposit, then payments as the structure, weathertight shell and interior are completed. We do not ask for the full price up front.

Is my loft high enough?

As a rule of thumb you need about 2.2 metres from the top of the ceiling joists to the underside of the ridge. A dormer then gives full height across most of the room.

How long does a dormer loft conversion take?

On site, 6 to 8 weeks for a rear dormer. Design and approvals usually add four to eight weeks before the start date.

Do you cover the area around Washington?

Yes. We work throughout Tyne and Wear, including Felling, Houghton-le-Spring, Hebburn.

What will the dormer be clad in?

Usually hanging tiles or slates to match the roof, which the permitted development rules favour. Zinc, fibre-cement and render are options where planning permission is being sought anyway.