Dormer Loft Conversions
Hip-to-gable roof extension with a rear dormer on a semi-detached house

Hip-to-Gable and Rear Dormer Conversions in Boston

If your Boston home needs another bedroom or a place to work, the loft is usually the cheapest space to gain. This page covers a hip-to-gable and rear dormer conversion in Boston: price, planning and timescale.

What does a hip-to-gable and rear dormer conversion cost in Boston?

£49,995 to £71,995Guide price for a typical project in Boston, 2026.

Our guide price for a hip-to-gable and rear dormer conversion in Boston is £49,995 to £71,995. That reflects labour and material costs in the East Midlands, which sit below the national average.

Will it need planning permission in Boston?

Planning rules in Boston are the national ones for England: 40 cubic metres of added roof volume for a terrace, 50 for a semi or detached house, nothing forward of the roof slope facing the road, and no balconies.

On a semi-detached or detached house the hip-to-gable and the dormer together are usually permitted development if their combined volume is within 50 cubic metres.

Dormer conversions in Boston

We cover the whole of Boston, about 27 miles from Lincoln. Much of the housing here is two-storey brick terraces and semis with simple gable roofs, which are among the easiest roofs to add a dormer to.

What is included?

A hip-to-gable and rear dormer conversion rebuilds the sloping side of a hipped roof as a vertical gable wall, then adds a dormer across the enlarged rear slope.

  • Steel ridge and floor beams to engineer's design
  • Gable window, obscure-glazed where it faces a neighbour
  • Rear dormer built across the widened roof
  • Hip rebuilt as a gable in brick, block or tile-hung timber frame

How it works

  1. SurveyWe measure the loft, check head height and structure, and confirm what planning route applies.
  2. Design and quoteYou receive drawings, a specification and one fixed written price.
  3. ApprovalsWe deal with building control, party wall notices and any planning paperwork.
  4. BuildScaffold up, steel in, dormer built and made watertight, then stairs and interior.

Questions about a hip-to-gable and rear dormer conversion in Boston

How long does a hip-to-gable and rear dormer conversion take?

On site, 8 to 11 weeks. Design and approvals usually add four to eight weeks before the start date.

Is my loft high enough?

As a rule of thumb you need about 2.2 metres from the top of the ceiling joists to the underside of the ridge. A dormer then gives full height across most of the room.

How are payments staged?

In stages tied to progress, set out in your quote: a deposit, then payments as the structure, weathertight shell and interior are completed. We do not ask for the full price up front.

Who do I contract with?

Your contract is with S&K Property Investments and Improvement Ltd. The work is carried out by our vetted subcontract teams under our supervision, and we remain responsible for it.

Does a hip-to-gable need planning permission?

Not usually on a house outside protected areas, as long as the gable and dormer together are within the volume limit and the materials are similar in appearance to the existing house.

Nearby

Read more: Hip-to-Gable and Rear Dormer Conversions · cost guide · planning rules

Call freeGet a guide price