Dormer Loft Conversions
Slate-clad flat-roofed rear dormer on a brick terraced house

Rear Dormer Loft Conversions in Thatcham

Our Berkshire team carries out rear dormer loft conversions in Thatcham from first survey to building control completion certificate, with the same site lead throughout.

What does a rear dormer loft conversion cost in Thatcham?

£39,245 to £61,495Guide price for a typical project in Thatcham, 2026.

Expect to pay around £39,245 to £61,495 in Thatcham. Steelwork, stairs and the dormer structure are the larger costs; decoration and flooring are the smaller ones.

Will it need planning permission in Thatcham?

Planning rules in Thatcham are the national ones for England: 40 cubic metres of added roof volume for a terrace, 50 for a semi or detached house, nothing forward of the roof slope facing the road, and no balconies.

Most rear dormers on houses fall within permitted development, provided the added roof volume stays within 40 cubic metres on a terrace or 50 cubic metres on a semi or detached house.

Dormer conversions in Thatcham

Thatcham has a population of about 25,000. Many commuter-belt streets are 1930s to 1960s houses with generous roof pitches, which tend to give good head height for a dormer.

What is included?

A rear dormer loft conversion is a flat-roofed extension built out from the back slope of your roof, giving a full-height room where there was only sloping loft space.

  • New floor structure and steel beams designed by a structural engineer
  • Windows sized for light, ventilation and the planning rules
  • New staircase positioned over the existing stairs where possible
  • Flat roof in GRP or EPDM with a manufacturer-backed membrane

How it works

  1. SurveyWe measure the loft, check head height and structure, and confirm what planning route applies.
  2. Design and quoteYou receive drawings, a specification and one fixed written price.
  3. ApprovalsWe deal with building control, party wall notices and any planning paperwork.
  4. BuildScaffold up, steel in, dormer built and made watertight, then stairs and interior.

Questions about a rear dormer loft conversion in Thatcham

Who do I contract with?

Your contract is with S&K Property Investments and Improvement Ltd. The work is carried out by our vetted subcontract teams under our supervision, and we remain responsible for it.

How long does a rear dormer loft conversion take?

On site, 6 to 8 weeks. Design and approvals usually add four to eight weeks before the start date.

Do you cover the area around Thatcham?

Yes. We work throughout Berkshire, including Newbury, Reading, Lower Earley.

Can we stay in the house during the work?

Yes. Most of the build is done from the scaffold through the roof. The disruptive part is fitting the new stairs, which usually takes a few days near the end.

How much floor space does a rear dormer add?

A rear dormer typically turns a loft into a room of 15 to 25 square metres of full-height floor area on an average three-bed house, enough for a double bedroom and often an en-suite.

Nearby

Read more: Rear Dormer Loft Conversions · cost guide · planning rules

Call freeGet a guide price